Installation Manual – BTS3606A Cabinet Installation
Airbridge BTS3606&3606A CDMA Base Station
Chapter 1 Installation Preparations
Huawei Technologies Proprietary
1-6
1.4 Unpacking
This section describes the requirements and procedures of unpacking wooden cases
and cartons.
1.4.1 Unpacking Requirements
After the project begins, the project supervisor must check the products together with
the customer.
Check the following points:
z
The total number of products is consistent with the packing list attached to the
packing case.
z
The arrival place is the installation site.
z
The packing case is in good condition.
z
The cabinet is placed upside down.
If the outer package is damaged or soaked; or the equipment is soaked and becomes
rusty, stop unpacking and find the cause. Feed back the situation to the local Huawei
Representative Office.
Note:
To protect the equipment and find out the cause, move the unpacked equipment indoor
for proper storage, and take a photo for the storage site, the rusty or corroded
equipment, packing cases, packaging materials. Keep these photos and store the
unpacked packing cases and packaging materials.
If the outer package is in good condition, follow the procedure below to unpack and
check the equipment:
1)
Unpack the case labeled "contains Packing List”, and take out the Packing List.
Check the case according to the Packing List.
2)
If shortage and miscarriage occur, fill in the Cargo Shortage and Miscarriage
Report.
3)
If cargo damage occurs, fill in the Cargo Replacement Application Form.
4)
Sign the Packing List together with the customer.