Installation Manual – BTS3606A Cabinet Installation
Airbridge BTS3606&3606A CDMA Base Station
Chapter 1 Installation Preparations
Huawei Technologies Proprietary
1-4
heavy snow, the snow will not cover the lowest air inlet on the cabinet. It is suggested
that the depth of the cement base be larger than 100 mm.
When finish making a cement base, it is necessary to measure its levelness and
plainness. The levelness is required to be equal to or smaller than 5 mm, and the
surface plainness is required to be equal to or smaller than 5 mm.
2500
2200
100
Figure 1-1
Dimensions of cement base of BTS3606A single cabinet (unit: mm)
II. Cement Base of BTS3606A Cabinet and Auxiliary Battery Cabinet
If the auxiliary battery cabinet is selected, the cement base can be made according to
the appearance and dimensions illustrated in Figure 1-2. The requirements are the
same as those for a BTS3606A single cabinet in thickness, levelness, and
smoothness.
3700
2200
100
Figure 1-2
Dimensions of cement base of BTS3606A cabinet and auxiliary battery
cabinet (unit: mm)
III. Cement Base of Auxiliary Battery Cabinet in Capacity Expansion
If you have installed a BTS3606A cabinet, and if you want to expand its battery capacity
by installing an auxiliary battery cabinet, you will have to add the length of the cement
base for the BTS3606A cabinet. See Figure 1-2 for the requirements in appearance
and dimension. The requirements are the same as those for a BTS3606A cabinet in
thickness, levelness, and smoothness.