Installation Manual – BTS3606A Cabinet Installation
Airbridge BTS3606&3606A CDMA Base Station
Chapter 5 Installing Cables
Huawei Technologies Proprietary
5-18
TX
1
TX
2
RX
2
CMPA
RX
1
CDDU
Sector A
Sector B
Sector C
CMTR
TXF
TX
2
MRO
MR
I
DR
I
CMPA
CMTR
TX
F
TX
2
MRO
MR
I
DR
I
TX
1
TX
2
RX
2
CMPA
RX
1
CDDU
CMTR
TXF
TX
2
MRO
MR
I
DR
I
CMPA
CMTR
TXF
TX
2
MRO
MR
I
DR
I
TX
1
TX
2
RX
2
CMPA
RX
1
CDDU
CMTR
TXF
TX
2
MRO
MR
I
DR
I
CMPA
CMTR
TXF
TX
2
MRO
MR
I
DR
I
Sample
RF_in
Sample
RF_in
Sample
RF_in
Sample
RF_in
Sample
RF_in
Sample
RF_in
RF_out
RF_out
RF_out
RF_out
RF_out
RF_out
Figure 5-15
High-Power S(2/2/2), High-Power S(3/3/3), S(4/4/4), S(5/5/5), and S(6/6/6)
configuration
5.4 Installing E1/T1 Cables
The installation of E1/T1 cables involves the following tasks:
z
Planning the installation position of E1/T1 cables
z
Waterproofing E1/T1 cables
z
Shielding E1/T1 cables
z
Connecting E1/T1 cables
This section describes these four steps in detail.
5.4.1 Planning Installation Position of E1/T1 Cables
To plan the installation position of E1/T1 cables, proceed as follows:
1)
Remove the front panel of the lightning protection box, as shown in Figure 5-16.