Cable No.
Cable name
60
+27 V power input cable of CRFM5
64
Power input cable of baseband fan box
65
Power input cable of the baseband subrack
54
+27 V power input cable of the baseband filter
26
L1-phase test alarm cable
38
Signal cable of the battery control switch
36
Alarm cable of the humidity sensor
66
Alarm cable of the smoke sensor
21
Alarm cable of the AC lightning arrester
37
Air conditioner alarm cable
19
Fuse alarm cable
1 – 4
Power cable from the lightning arrester to the AC filter
22 – 25
Power cable from the AC power distribution box to the PSU
AC/DC
subrack
28
–48 V power cable from PSU
AC/DC
subrack to the PSU
DC/DC
subrack
31 and 30
–48 V GND cable
29
–48 V power cable from the PSU
AC/DC
subrack to the –48 V switch box
33
+27 V GND cable
35
Alarm cable from the conversion board to the PMU
7 – 10
GPS RF cable
34
+27 V power cable
11 – 16
Antenna jumper
40 E1/T1
cable
67
Power cable on the test port of the +27 V switch box
61
+27 V GND input cable of baseband filter
39
Alarm cable of baseband subrack
18
–48 V GND cable from the PSU
AC/DC
subrack to the battery
17
–48 V power cable from the fuse to the battery
5.3 Installing RF Cables