d. Re-connect all wiring connections.
e. Inspect the gas valve to assure the O-ring is in place.
f. Replace the (4) screws on the aluminum connector on the gas valve. Turn the gas back on.
(IMPORTANT: CHECK FOR
GAS LEAKS BEFORE TURNING THE APPLIANCE ON!)
g. Turn the boiler power back on and create a demand on the boiler. When boiler is lit, observe condensate flow from the
boiler. Be sure the boiler is operating properly.
h. Re-connect the condensate piping to the outside condensate connection.
Содержание MODCON1000
Страница 40: ...40 LP 428 REV 9 2 14 E GAS VALVE Figure 22 Mod Con 1000 Gas Valve ...
Страница 46: ...46 LP 428 REV 9 2 14 Figure 25 Figure 26 Cascade Resistor Plug Installation Detail ...
Страница 47: ...47 LP 428 REV 9 2 14 Figure 27 Mod Con Cascade Master and Follower Wiring ...
Страница 48: ...48 LP 428 REV 9 2 14 Figure 28 Mod Con Internal Connection Diagram LP 428 K ...
Страница 70: ...70 LP 428 REV 9 2 14 Figure 31 MOD CON 1000 External Parts Blowout ...
Страница 71: ...71 LP 428 REV 9 2 14 Figure 32 MOD CON 1700 External Parts Blowout ...
Страница 72: ...72 LP 428 REV 9 2 14 Figure 33 ...
Страница 73: ...73 LP 428 REV 9 2 14 Figure 34 LP 445 S ...
Страница 74: ...74 LP 428 REV 9 2 14 Figure 35 LP 428 V ...
Страница 75: ...75 LP 428 REV 9 2 14 Figure 36 ...
Страница 78: ...78 LP 428 REV 9 2 14 ...
Страница 79: ...79 LP 428 REV 9 2 14 ...
Страница 80: ...80 LP 428 REV 9 2 14 MAINTENANCE NOTES ...