6
LP- 428 REV. 9.2.14
G. OUTDOOR SENSOR ............................................................................................................................................................... 43
H. INDIRECT SENSOR (TOP BOILER CONNECTION) ............................................................................................................... 43
I. OPTIONAL 0-10 VOLT BUILDING CONTROL SIGNAL ............................................................................................................ 43
J. OPTIONAL HIGH GAS PRESSURE SWITCH .......................................................................................................................... 44
K. OPTIONAL LOW GAS PRESSURE SWITCH .......................................................................................................................... 44
L. OPTIONAL FLOW SWITCH ...................................................................................................................................................... 44
M. OPTIONAL UL353 LOW WATER CUT-OFF INTERFACE KIT ................................................................................................ 44
N. WIRING OF THE CASCADE SYSTEM COMMUNICATION BUS ............................................................................................ 45
PART 8
– START-UP PREPARATION...................................................................................................................................... 49
A. CHECK / CONTROL WATER CHEMISTRY ............................................................................................................................. 49
B. FREEZE PROTECTION (WHEN USED) .................................................................................................................................. 50
C. FILL AND TEST WATER SYSTEM .......................................................................................................................................... 50
D. PURGE AIR FROM WATER SYSTEM ..................................................................................................................................... 50
E. CHECK FOR GAS LEAKS ........................................................................................................................................................ 51
F. CHECK THERMOSTAT CIRCUIT(S) ........................................................................................................................................ 51
G. CONDENSATE REMOVAL ...................................................................................................................................................... 51
H. FINAL CHECKS BEFORE STARTING BOILER ....................................................................................................................... 52
I. CASCADE SYSTEM
– MOD CON 1000 AND 1700 MODELS ................................................................................................... 52
PART 9
– START-UP PROCEDURE ......................................................................................................................................... 53
A. CONTROL OVERVIEW ............................................................................................................................................................ 53
B. NAVIGATION OF THE DISPLAY .............................................................................................................................................. 53
C. OPERATING INSTRUCTIONS ................................................................................................................................................. 54
D. PROGRAMMING BOILER SETTINGS ..................................................................................................................................... 54
E. PROGRAMMING THE SYSTEM SETTING .............................................................................................................................. 55
F. SYSTEM SETTING PROGRAM NAVIGATION......................................................................................................................... 55
G. RESETTING THE MAINTENANCE SCHEDULE...................................................................................................................... 57
PART 10
– START-UP PROCEDURES FOR INSTALLER ....................................................................................................... 58
A. BOILER CONTROL STATUS MENU ........................................................................................................................................ 58
B. BOTTOM BOILER (MASTER) MENU ONLY ............................................................................................................................ 60
C. BOILER TEST MODE ............................................................................................................................................................... 60
PART 11
– SHUTDOWN ............................................................................................................................................................ 61
A. SHUTDOWN PROCEDURE ..................................................................................................................................................... 61
B. VACATION PROCEDURE ........................................................................................................................................................ 61
C. FAILURE TO OPERATE ........................................................................................................................................................... 61
PART 12
– TROUBLESHOOTING ............................................................................................................................................ 61
A. BOILER ERROR CODE ............................................................................................................................................................ 61
B. BOILER ERROR ....................................................................................................................................................................... 61
C. BOILER FAULT ........................................................................................................................................................................ 62
D. USER INTERFACE DISPLAY .................................................................................................................................................. 62
PART 13
– MAINTENANCE ...................................................................................................................................................... 67
A. MAINTENANCE PROCEDURES .............................................................................................................................................. 67
Содержание MODCON1000
Страница 40: ...40 LP 428 REV 9 2 14 E GAS VALVE Figure 22 Mod Con 1000 Gas Valve ...
Страница 46: ...46 LP 428 REV 9 2 14 Figure 25 Figure 26 Cascade Resistor Plug Installation Detail ...
Страница 47: ...47 LP 428 REV 9 2 14 Figure 27 Mod Con Cascade Master and Follower Wiring ...
Страница 48: ...48 LP 428 REV 9 2 14 Figure 28 Mod Con Internal Connection Diagram LP 428 K ...
Страница 70: ...70 LP 428 REV 9 2 14 Figure 31 MOD CON 1000 External Parts Blowout ...
Страница 71: ...71 LP 428 REV 9 2 14 Figure 32 MOD CON 1700 External Parts Blowout ...
Страница 72: ...72 LP 428 REV 9 2 14 Figure 33 ...
Страница 73: ...73 LP 428 REV 9 2 14 Figure 34 LP 445 S ...
Страница 74: ...74 LP 428 REV 9 2 14 Figure 35 LP 428 V ...
Страница 75: ...75 LP 428 REV 9 2 14 Figure 36 ...
Страница 78: ...78 LP 428 REV 9 2 14 ...
Страница 79: ...79 LP 428 REV 9 2 14 ...
Страница 80: ...80 LP 428 REV 9 2 14 MAINTENANCE NOTES ...