12 Maintenace notes
469
SMGB0064 rev.0 - 08/2011
12
12.8 Maintenance work
For the indoor unit and the outdoor unit
1
Fan and fan motor
• Lubrication: All the fan motors are pre-lubricated and sealed at the factory. Therefore no lubrication maintenance
is required.
• Sound and vibration: Check for abnormal sounds and vibrations.
• Rotation: Check the clockwise rotation and the rotating speed.
• Insulation: Check the electrical insulation resistance.
2
Heat exchanger
• Clog: Inspect the heat exchanger at regular intervals and remove any accumulated dirt and any accumulated dust
from the heat exchanger. You should also remove from the outdoor units other obstacles such as the growing grass
and the pieces of paper which might restrict the airflow.
3
Piping connection
• Leakage: Check for the refrigerant leakage at the piping connection.
4
Cabinet
• Stain and lubrication: Check for any stain and any lubrication. Remove the stain and the lubrication.
• Fixing screw: Check for any loosened screw or any lost screw. Fix the loosened screws and the lost screws. Insu-
lation material: Check for any peeled thermal insulator on the cabinet. Repair the thermal insulator.
5
Electrical equipment
• Activation: Check for an abnormal activation of the magnetic contactor the auxiliary relay the PCB and others.
• Line condition: Pay attention to the working voltage the working amperage and the working phase balance. Check
for any faulty contact that is caused by the loosened terminal connections the oxidized contacts the foreign matter
and other items. Check the electrical insulation resistance.
6
Control device and protection device
• Setting: Do not readjust the setting in the field unless the setting is maintained at a point that is different from the
point listed in the section
For the outdoor unit
1
Compressor
• Sound and vibration: Check for abnormal sounds and vibrations.
• Activation: Check that the voltage drop of the power supply line is within 15 at the start and within 2 during the
operation.
2
Reverse valve
• Activation: Check for any abnormal activation sound.
3
Strainer
• Clog: Check that there is no temperature difference between both ends.
4
Ground wire
• Ground line: Check for the continuity to earth.
5
Oil heater
• Activation: You should activate the oil heater at least twelve hours before the start-up by turning ON the main
switch.
Содержание RAS-(2-3)HVRN(S)(2)
Страница 2: ......
Страница 4: ...IV SMGB0064 rev 0 08 2011 Index ...
Страница 10: ...x Contens SMGB0064 rev 0 08 2011 ...
Страница 58: ...2 Unit Installation 48 SMGB0064 rev 0 08 2011 ...
Страница 119: ...4 Electrical Wiring 109 SMGB0064 rev 0 08 2011 4 RAS 4 6 HVRNM2E ...
Страница 120: ...4 Electrical Wiring 110 SMGB0064 rev 0 08 2011 RAS 4 6 HRNM2E ...
Страница 122: ...4 Electrical Wiring 112 SMGB0064 rev 0 08 2011 4 6 2 Electrical wiring diagrams for ES Series RAS 2 2 5 HVRN2 ...
Страница 123: ...4 Electrical Wiring 113 SMGB0064 rev 0 08 2011 4 RAS 3HVRNS2 ...
Страница 124: ...4 Electrical Wiring 114 SMGB0064 rev 0 08 2011 RAS 4 6 HVRNS2E ...
Страница 125: ...4 Electrical Wiring 115 SMGB0064 rev 0 08 2011 4 RAS 4 6 HRNS2E ...
Страница 126: ...4 Electrical Wiring 116 SMGB0064 rev 0 08 2011 RAS 8 10 HRNSE ...
Страница 147: ...5 Control System 137 SMGB0064 rev 0 08 2011 5 Dry operation Continues in the next page ...
Страница 149: ...5 Control System 139 SMGB0064 rev 0 08 2011 5 Heating operation Continues in the next page ...
Страница 150: ...5 Control System 140 SMGB0064 rev 0 08 2011 ...
Страница 155: ...5 Control System 145 SMGB0064 rev 0 08 2011 5 Activation for protection device control ...
Страница 164: ...5 Control System 154 SMGB0064 rev 0 08 2011 Activation for protection device control ...
Страница 168: ...5 Control System 158 SMGB0064 rev 0 08 2011 Preheating control of compressor ...
Страница 170: ......
Страница 182: ......
Страница 226: ...8 Troubleshooting 216 SMGB0064 rev 0 08 2011 ...
Страница 265: ...8 Troubleshooting 255 SMGB0064 rev 0 08 2011 8 RAS 4 6 H V RNS2E ...
Страница 266: ...8 Troubleshooting 256 SMGB0064 rev 0 08 2011 RAS 8 10 HRNSE ...
Страница 271: ...8 Troubleshooting 261 SMGB0064 rev 0 08 2011 8 RAS 8 10 HRNSE ...
Страница 294: ...8 Troubleshooting 284 SMGB0064 rev 0 08 2011 ...
Страница 298: ...8 Troubleshooting 288 SMGB0064 rev 0 08 2011 ...
Страница 336: ...9 Spare Parts 326 SMGB0064 rev 0 08 2011 9 1 Spare parts for IVX Series RAS 3HVRNM2E Cycle and structural parts ...
Страница 339: ...9 Spare Parts 329 SMGB0064 rev 0 08 2011 9 RAS 4 6 HVRNM2E Cycle and structural parts ...
Страница 342: ...9 Spare Parts 332 SMGB0064 rev 0 08 2011 RAS 4 6 HRNM2E Cycle and structural parts ...
Страница 344: ...9 Spare Parts 334 SMGB0064 rev 0 08 2011 Electrical parts ...
Страница 355: ...9 Spare Parts 345 SMGB0064 rev 0 08 2011 9 RAS 4 6 HVRNS2E Cycle structural ...
Страница 357: ...9 Spare Parts 347 SMGB0064 rev 0 08 2011 9 Electrical parts ...
Страница 359: ...9 Spare Parts 349 SMGB0064 rev 0 08 2011 9 RAS 4 6 HRNS2E Cycle structural ...
Страница 361: ...9 Spare Parts 351 SMGB0064 rev 0 08 2011 9 Electrical parts ...
Страница 363: ...9 Spare Parts 353 SMGB0064 rev 0 08 2011 9 RAS 8 10 HRNSE Cycle and structural ...
Страница 366: ...9 Spare Parts 356 SMGB0064 rev 0 08 2011 Electrical parts ...
Страница 368: ......
Страница 448: ......
Страница 470: ......
Страница 487: ......