Introduction
Hitachi Compute Rack 220S CRU Replacement Guide
Network interface connectors 1, 2, 3, 4
The status LEDs on the connector are explained as follows.
Figure 1-7: Network interface connector status LED
Table 1-8: Network interface connector status LED indicate
Location
Name
State
Description
Green-On
A link with a HUB has been established.
Green-Blink
Data is being transmitted or received.
1 Activity
LED
Off
A link with a HUB has not been established.
Amber-On*
A 1000BASE-T link with a hub has been
established.
Green-On*
A 100BASE-TX link with a hub has been
established.
Amber-Blink
A 1000BASE-T link with a hub is being
established.
Green-Blink
A 100BASE-TX or 10BASE-T link with a hub is
being established.
2 Link
LED
Off
A 10BASE-T link with a hub has been
established or link with a hub has not been
established.
The Activity LED shows either case.
* AC power is still supplied even if the power of the system unit is turned off, but this LED will be turned
off because only link by 10BASE-T can be established.
Onboard LAN controllers (network interfaces) displayed by the
device manager are as follows:
–
Onboard LAN1: PCI bus 6, device 0, function 0
–
Onboard LAN2: PCI bus 6, device 0, function 1
–
Onboard LAN3: PCI bus 6, device 0, function 2
–
Onboard LAN4: PCI bus 6, device 0, function 3
The number of the network adapter which is the network interface
connector recognized by the device manager may not match to the
network interface connector number.
1
2
Содержание Compute Rack 220S
Страница 1: ...MK 90CRS003 01 Hitachi Compute Rack 220S CRU Replacement Guide FAS TFIND LINK S Getting Help Contents ...
Страница 32: ...1 12 Introduction Hitachi Compute Rack 220S CRU Replacement Guide ...
Страница 74: ...4 24 Replacing parts Hitachi Compute Rack 220S CRU Replacement Guide ...
Страница 79: ...Hitachi Compute Rack 220S CRU Replacement Guide ...