888-2406-002
2-5
WARNING: Disconnect primary power prior to servicing.
Installation & Initial Turn-On
2.5.4
3-Phase Power Supply Installation
The Z2 transmitter can be configured with either a 3-Phase or Single Phase power
supply. Operation of the supplies is basically the same with both using the dynamic
tap switching for efficiency. However, their physical make-up is different and
requires separate installation procedures. The 3-phase will be discussed first, then
the Single Phase will follow. Note that some transmitters may be shipped with the
power supply installed, depending on where and how it is shipped. If the power
supply was shipped installed in the transmitter, skip to "2.5.6 Transmitter AC
Connections" on page 2-13. Before installing the power supply check the primary
AC tapping on the power transformers as outlined below.
!
WARNING:
DISCONNECT AND LOCKOUT STATION PRIMARY POWER AT THE WALL
BREAKER BEFORE MAKING ANY CONNECTIONS.
2.5.4.1 Power Transformer Tapping
The power transformers are tapped at the factory for the primary AC voltage
specified by the customer. This voltage should be documented in the factory test
data accompanying the transmitter and tagged at the main contactor in the rear of
the transmitter. However, the voltage at the site and the transformer tapping should
be verified by the installation personnel. The input voltage and strapping chart is
shown on the Overall System Block Diagram along with the transformer schematic.
Verification and/or re-tapping will require opening the power supply access panel
on the front of the transmitter and rolling out the power supply (this is only if the
transmitter was shipped with the power supply installed). To remove the power
supply refer to Section V, under the heading “Power Supply Removal.”
2.5.4.2 Power Supply Connections
First, remove the front cover panel from the power supply compartment at the
bottom of the transmitter. The power supply connection cables are either tied up in
the power supply compartment (in the bottom of the transmitter) or tied up with the
power transformers. The power supply should be rolled into position in front of the
transmitter, then carefully rolled into the transmitter making sure that none of the
interconnect cables get caught on the power supply tray.
The following cables will need to be connected:
a.
There is one ribbon cable W11 (blue) and one control voltage cable W21
(gray with orange connector) hanging on the right side of the power supply
compartment. Connect W11 to J4 on the Rectifier Board (on the Left side of
the supply). Connect W21 (flat gray cable with orange connector) to J6 on the
PS1 Rectifier Board (on the right side of the supply). See Figure 2-1.
Содержание Platinum Z2 CD
Страница 4: ...888 2406 002 WARNING Disconnect primary power prior to servicing ...
Страница 6: ...888 2406 002 WARNING Disconnect primary power prior to servicing ...
Страница 8: ...888 2406 002 WARNING Disconnect primary power prior to servicing ...
Страница 10: ...888 2406 002 WARNING Disconnect primary power prior to servicing ...
Страница 20: ...1 6 888 2406 002 WARNING Disconnect primary power prior to servicing Introduction Specifications ...
Страница 70: ...3 14 888 2406 002 WARNING Disconnect primary power prior to servicing Operator Guide ...
Страница 130: ...4 60 888 2406 002 WARNING Disconnect primary power prior to servicing Overall System Theory ...
Страница 156: ...5 26 888 2406 002 WARNING Disconnect primary power prior to servicing Maintenance and Alignment ...
Страница 194: ...6 38 888 2406 002 WARNING Disconnect primary power prior to servicing Troubleshooting ...
Страница 196: ...7 2 888 2406 002 WARNING Disconnect primary power prior to servicing Parts List ...