HARDY MANUFACTURING CO., INC (MODEL LC300, LC500 & LC2500)
PAGE 49
8-5
Draft Blower Replacement Instructions
Step
Operation Description
Visual Aids/Comments
1
Remove the plastic cable tie and disconnect the blower
power wires as shown. Remove damper lifter ring from
blower flapper lifter. Using a 5/16" wrench or other
suitable tool, remove the blower electrical box cover.
2
Slide a flat head screwdriver into plastic romex
connector and lift up wedge clamp. Pull blower power
wires through clamp. Remove clamp by pressing on
locking tang with a flat head screwdriver and pulling
away from blower.
3
Loosen and remove the three flange screws. Remove
blower from heater.
4
Place new flange gasket onto blower flange. Align
holes on gasket with holes in flange. Start inner screw
but do not tighten.
5
Position blower over gasket. Tighten inner screw to
hold blower in position, then install and tighten the two
outer screws.
Damper Lif ter
Ring
Blower electrical
box cov er
Plastic cable tie
and electrical
connections.
!
Hazardous Voltage! Disconnect Power to
Heater prior to performing this
maintenance operation.
Содержание LC300
Страница 2: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 10: ... MODEL LC300 LC500 LC2500 viii THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 70: ......
Страница 71: ......
Страница 72: ......