3-2-13 Exchange of pressure foot link and block
1. Move the head shaft lower.
2. Loosen the screw which fixes guide shaft
then move the guide shaft lower.
3. If you exchange block ass’y, loosen the screw which fixes
pressure foot link A then remove block ass’y.
4. If you remove the pressure foot link B ass’y, first remove
the pressure foot cam collar and pressure foot drive cam.
5. Remove pressure foot link B ass’y.
6. Assemble the parts by opposite procedure to terminate this
exchange.
When assembling each unit, please refer to each
procedure Instruction for assemble adjustment.
<Attention>
Position of guide shaft is attached to lowest and the side
of Head.
Содержание HCS2-1201-30
Страница 1: ...Maintenance Manual for Embroidery Machine HCS2 1201 30 Version 2 3 HappyJapan Inc...
Страница 75: ...76 6 Check up with thread trimmer function 7 Assemble lower front panel to terminate this procedure...
Страница 110: ...112 3 7 4 Exchange of Y carriage belt 1 Remove frame base 2 Disconnect X carriage cable 3 Remove X carriage 4 Remove arm...
Страница 154: ...153 5 1 1 Electrical connection diagram except for Rev A...
Страница 155: ...154 5 1 1 Electrical connection diagram except for Rev A...
Страница 156: ...155 5 1 2 List of electrical connection diagrams except for Rev A...
Страница 157: ...156 5 1 3 Electrical connection diagram for Rev A...
Страница 158: ...157 5 1 3 Electrical connection diagram for Rev A...
Страница 159: ...158 5 1 4 List of electrical connection diagrams for Rev A...
Страница 160: ...159 5 2 1 Connection of inverter 100V Inverter set...
Страница 161: ...160 5 2 2 Connection of inverter 200V Inverter set...
Страница 165: ...160c HCD8116 TP switch board ass y 6 5 265 2 1 6 7 257...
Страница 196: ...2017 8 HAPPYJAPAN Inc 9 5 TAITO 2 CHOME TAITO KU TOKYO JAPAN TEL 81 3 3834 0711 FAX 81 3 3835 8917...