18
3
No. message Error measure page
024 Needle center Stop position of needle bar is off center (1)Turn needle selection cam by hand to set to
regular position.
(2)If trouble occurs repeatedly, fix mechanical
trouble in needle selection & its vicinity.
025 Needle over Specified needle number went beyond Adjust position of needle selection cam (poten-
needle number of the machine. tiometer) and needle number of moving head. 3-4-2
026 Needle differ As needle number differed from memory (1)Turn power off once and turn on again.
when power turned on, it was renewed. (2)Let the machine recognize needle number. 3-4-2
030 Slow mismatch Inadequate adjustment of number of (1)Make automatic speed setting. 4-4-5
low speed revolution. (2)If not solved even after speed adjustment, 4-1-1
Low speed revolution doesn't come replace LCD-CE board.
below 100rpm.
050 C point Main shaft stops off its position. (1)Turn main shaft to plus direction to set to C point. ( 24-4 )
051 L sensor Poor lowest needle position sensor (1)If photo sensor is stained, clean. 4-2-1
on timing detecting circuit board. (2)Adjust timing.
Damage in timing detecting circuit (3)Replace main shaft timing circuit board.
board, stained photo sensor, poor
adjustment of slit disc.
052 C sensor Damage in color change point
sensor on timing circuit board.
Damage in timing detecting circuit
board, stained photo sensor, poor
adjustment of slit disc.
055 Take-up cover Take-up cover is open.
(1)Please close take-up cover.
Limit switch of take-up cover is defective
. (2)Replace the limit switch if defective.
060 X limit Drive frame went beyond limits in X direction. (1) Move drive frame back to limits with
move key.
061 Y limit Drive frame went beyond limits in Y direction. (2) Correct pattern size and setting contents.
( ) ----- Reference instruction book
Содержание HCS2-1201-30
Страница 1: ...Maintenance Manual for Embroidery Machine HCS2 1201 30 Version 2 3 HappyJapan Inc...
Страница 75: ...76 6 Check up with thread trimmer function 7 Assemble lower front panel to terminate this procedure...
Страница 110: ...112 3 7 4 Exchange of Y carriage belt 1 Remove frame base 2 Disconnect X carriage cable 3 Remove X carriage 4 Remove arm...
Страница 154: ...153 5 1 1 Electrical connection diagram except for Rev A...
Страница 155: ...154 5 1 1 Electrical connection diagram except for Rev A...
Страница 156: ...155 5 1 2 List of electrical connection diagrams except for Rev A...
Страница 157: ...156 5 1 3 Electrical connection diagram for Rev A...
Страница 158: ...157 5 1 3 Electrical connection diagram for Rev A...
Страница 159: ...158 5 1 4 List of electrical connection diagrams for Rev A...
Страница 160: ...159 5 2 1 Connection of inverter 100V Inverter set...
Страница 161: ...160 5 2 2 Connection of inverter 200V Inverter set...
Страница 165: ...160c HCD8116 TP switch board ass y 6 5 265 2 1 6 7 257...
Страница 196: ...2017 8 HAPPYJAPAN Inc 9 5 TAITO 2 CHOME TAITO KU TOKYO JAPAN TEL 81 3 3834 0711 FAX 81 3 3835 8917...