36
3-2-7 Exchange of roller shaft ass’y
1. Remove take-up lever crank ass’y.
Push take-up lever drive shaft by slender shaft.
(Hexagon wrench etc.)
2.Exchange roller shaft ass’y.
<Spanner> 7mm, 8mm
3. Insert bering positioning gauge [
4.85mm
] between bering
and bering , and then tighten roller shaft ass’y.
Please adjust roller shaft for machine front side ways.
This roller shaft ass’y is eccentricity.
Turn lean screw and just touch roller to gauge.
Bering positioning gauge [
4.85mm
]
4. Return take-up lever crank ass’y to previous place to finish.
Please push to arrow ways until stop.
Содержание HCS2-1201-30
Страница 1: ...Maintenance Manual for Embroidery Machine HCS2 1201 30 Version 2 3 HappyJapan Inc...
Страница 75: ...76 6 Check up with thread trimmer function 7 Assemble lower front panel to terminate this procedure...
Страница 110: ...112 3 7 4 Exchange of Y carriage belt 1 Remove frame base 2 Disconnect X carriage cable 3 Remove X carriage 4 Remove arm...
Страница 154: ...153 5 1 1 Electrical connection diagram except for Rev A...
Страница 155: ...154 5 1 1 Electrical connection diagram except for Rev A...
Страница 156: ...155 5 1 2 List of electrical connection diagrams except for Rev A...
Страница 157: ...156 5 1 3 Electrical connection diagram for Rev A...
Страница 158: ...157 5 1 3 Electrical connection diagram for Rev A...
Страница 159: ...158 5 1 4 List of electrical connection diagrams for Rev A...
Страница 160: ...159 5 2 1 Connection of inverter 100V Inverter set...
Страница 161: ...160 5 2 2 Connection of inverter 200V Inverter set...
Страница 165: ...160c HCD8116 TP switch board ass y 6 5 265 2 1 6 7 257...
Страница 196: ...2017 8 HAPPYJAPAN Inc 9 5 TAITO 2 CHOME TAITO KU TOKYO JAPAN TEL 81 3 3834 0711 FAX 81 3 3835 8917...