61
At this time, a moving head is pushed from the front and it is
LM guide.
It is made for there to be no crevice.
10. Tighten an outside screw (arrow portion in a figure).
11. Check center (right and left)(back and forth) of needle and
needle hole of needle plate.(Needle No.1 ,6 and 12.)
<Caution>
Should be check needle No.1 ,6 and 12.
Needle hole of needle plate Needle
12. If not center (back and forth),please adjust needle position
(back and forth).
Refer to [3-3-4 Adjustment
of needle position (back and
forth)].
13. If not center (right and left), please adjust again
procedure 6-10.
14. If “OK”. Please check [needle position].
Refer to [3-3-5 Check of needle position].
If “NG” this process, adjust again procedure 12-13.
Содержание HCS2-1201-30
Страница 1: ...Maintenance Manual for Embroidery Machine HCS2 1201 30 Version 2 3 HappyJapan Inc...
Страница 75: ...76 6 Check up with thread trimmer function 7 Assemble lower front panel to terminate this procedure...
Страница 110: ...112 3 7 4 Exchange of Y carriage belt 1 Remove frame base 2 Disconnect X carriage cable 3 Remove X carriage 4 Remove arm...
Страница 154: ...153 5 1 1 Electrical connection diagram except for Rev A...
Страница 155: ...154 5 1 1 Electrical connection diagram except for Rev A...
Страница 156: ...155 5 1 2 List of electrical connection diagrams except for Rev A...
Страница 157: ...156 5 1 3 Electrical connection diagram for Rev A...
Страница 158: ...157 5 1 3 Electrical connection diagram for Rev A...
Страница 159: ...158 5 1 4 List of electrical connection diagrams for Rev A...
Страница 160: ...159 5 2 1 Connection of inverter 100V Inverter set...
Страница 161: ...160 5 2 2 Connection of inverter 200V Inverter set...
Страница 165: ...160c HCD8116 TP switch board ass y 6 5 265 2 1 6 7 257...
Страница 196: ...2017 8 HAPPYJAPAN Inc 9 5 TAITO 2 CHOME TAITO KU TOKYO JAPAN TEL 81 3 3834 0711 FAX 81 3 3835 8917...