Figure 1-1
Installation space
•
Ensure that the Tesseract 5K14 is installed in a well-ventilated
environment.
•
Ensure that the Tesseract 5K14 heat sinks are free from blockage.
•
Do not open the front panel of the Tesseract 5K14.
•
Do not remove the terminals and ports at the bottom of the
Tesseract 5K14.
Electrical Connections
Before connecting cables, ensure that the Tesseract 5K14 is secured in position and
not damaged in any way. Otherwise, electric shocks or fire may occur.
•
Ensure that all electrical connections comply with local electrical
standards.
•
Obtain approval from the local utility company before using the
Tesseract 5K14 to generate electricity in grid-tied mode.
•
Ensure that the cables used in a grid-tied PV system are properly
connected and insulated, and meet all specification requirements.
Содержание Tesseract 5K14
Страница 1: ...Installation Manual Tesseract 5K14 Integrated Home Battery Storage System Version 1 0...
Страница 24: ...Figure 4 10 Mounting the side panels...
Страница 37: ...Step 6 Make sure the positive and negative sides of the battery are connected...
Страница 62: ...6...
Страница 63: ......