Personnel Requirements
Only certified electricians are allowed to install, connect cables for,
commission, maintain, troubleshoot, and replace the Tesseract 5K14.
•
Operation personnel should receive professional training.
•
Operation personnel should read through this document and follow
all the precautions.
•
Operation personnel should be familiar with the safety specifications
about the electrical system.
•
Operation personnel should understand the composition and
working principles of the grid-tied PV system and local regulations.
•
Operation personnel must wear proper personal protective
equipment (PPE).
Protect Labels
•
Do not scrawl or damage any labels on the Tesseract 5K14
enclosure because these labels contain important information about
safe operation.
•
Do not scrawl or damage the nameplate on the Tesseract 5K14
enclosure because it contains important product information.
Installation
Never operate the Tesseract 5K14 under power during installation.
•
Ensure that the Tesseract 5K14 is not connected to a power supply
or powered on before finishing installation.
•
To allow proper heat dissipation and installation, maintain
appropriate clearances between the Tesseract 5K14 and other
objects, as shown in Figure 1-1. If you have any questions about the
clearances, consult your local technical support engineers.
Содержание Tesseract 5K14
Страница 1: ...Installation Manual Tesseract 5K14 Integrated Home Battery Storage System Version 1 0...
Страница 24: ...Figure 4 10 Mounting the side panels...
Страница 37: ...Step 6 Make sure the positive and negative sides of the battery are connected...
Страница 62: ...6...
Страница 63: ......