6
System Commissioning
Checking before Powering On
Table 6-1
Installation checklist
No.
Check Item
Acceptance Criteria
1
Tesseract 5K14
installation
The Tesseract 5K14 is installed correctly, securely and
reliably.
2
Cable layout
Cables are routed properly as required by the customer.
3
Cable tie
Cable ties are secured evenly and no burr exists.
4
Grounding
The ground cable is connected correctly, securely and
reliably.
5
DC switch
The DC switch and all the switches connecting to the
Tesseract 5K14 are OFF.
6
Cable
connections
The AC output power cable, DC input power cable, battery
cable, and signal cable are connected correctly, securely
and reliably.
7
Unused terminals
& ports
Unused terminals and ports are locked by watertight caps.
8
Installation
environment
The installation space is proper, and the installation
environment is clean and tidy without foreign matter.
Содержание Tesseract 5K14
Страница 1: ...Installation Manual Tesseract 5K14 Integrated Home Battery Storage System Version 1 0...
Страница 24: ...Figure 4 10 Mounting the side panels...
Страница 37: ...Step 6 Make sure the positive and negative sides of the battery are connected...
Страница 62: ...6...
Страница 63: ......