
Genevac HT-8 & HT-12 Series II Evaporating Systems
Page 8 of
64
04-4541
Issue 1-9 – June 2008
3
Scope of delivery and installation
You will have purchased your system with or without
the option of commissioning by Genevac personnel
and possibly, without the option of a Genevac
vacuum pump and condenser.
Reference will be made in the following notes to the
installation procedures required to cover these
options.
On delivery, it is advisable to unpack your system at
the point of receipt, to ease the movement of the
component parts to the point of use.
3.1 Checking the delivery
Check the contents of the delivery as soon as
possible against the delivery note and notify
Genevac Ltd immediately of any missing or
damaged parts. (Refer to section 10 for contact
details).
3.2 Arranging
commissioning
If your system is to be delivered separately, Genevac
Ltd will contact you prior to the delivery, to agree a
date to commission your system.
3.3 Training
Commissioning will normally include training in the
basic operation of the System. Further in house
training is recommended to fully exploit the flexibility
of the system.
THE HT-8/HT-12 EVAPORATOR MUST NOT BE
OPERATED BY PERSONNEL WHO LACK THE
TRAINING OR PROFESSIONAL EXPERIENCE TO
COMPREHEND THE HAZARDS THAT CAN ARISE
WHEN USING THE SYSTEM.
Personnel without such training require thorough
instruction. These operating instructions should form
the basis of this instruction.
3.4 Positioning
the
evaporator
POSITION THE EVAPORATOR AT LEAST 300 MM
AWAY FROM THE EDGE OF A BENCH AND THE
SAME DISTANCE CLEAR OF BREAKABLE
OBJECTS OR AREAS WHERE ENTRAPMENT
COULD OCCUR.
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com