
Genevac HT-8 & HT-12 Series II Evaporating Systems
04-4541
Issue 1-9 – June 2008
Page 49 of
64
If you have a CVP Pump refer to the following:
Connect the other end of the lead from the pump to
this socket on the chamber
Connect the control lead from the chamber to the
condenser.
Connect the power lead to the chamber.
Connect the pump exhaust to the condenser exhaust
inlet port.
Connect the condenser solvent drain pipes to the to
the outlets indicated.
It is wise at this stage to inspect the seals and
clamps and replace them if necessary.
Connect the heated inlet tube from the chamber to
the condenser port.
Connect the vacuum pump outlet to the condenser
vacuum inlet port.
Connect the pump exhaust to
IN
on the condenser
exhaust pot.
Connect the vent pipe to the condenser
OUT
exhaust port and ensure that this is suitably vented.
Connect the system to the mains, close the door and
start the system.
If the system is taking a long time to get to full
vacuum, it is possible that there is a leak.
Refer to
Section 8
Fault Finding
for assistance.
Ensure that you have refilled the pump if you
have drained it before switching the system on
(refer to page 37).
Vacuum
outlet
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com