Typhoon
Operating Instructions
28-9623-56
AA
23
Installation 3
Site requirements 3.1
3 Installation
This chapter provides information regarding installation of the Typhoon system.
For detailed information on installation, see
Typhoon Installation Instructions.
3.1 Site requirements
3.2 Transport
If you need to move the instrument, contact Technical Support. See back cover for
contact information.
3.3 Unpacking
•
Check the equipment for any apparent damage before starting installation.
•
Document any damage carefully and contact your GE Healthcare representative.
Parameter
Requirement
Power supply
100-240 V AC, 50/60Hz
Ambient temperature
15°C to 30°C
Placement
Stable laboratory bench
Humidity
10% to 80%, non-condensing
CAUTION
Heavy object.
The Typhoon instrument weighs approximately 160 kg.
The instrument should be moved only by authorized Technical Support
representatives using the proper lifting equipment.
Содержание Typhoon 9200
Страница 2: ...GE Healthcare Typhoon Operating Instructions Original instructions...
Страница 3: ......
Страница 13: ...1 Introduction 1 4 Control software 12 Typhoon Operating Instructions 28 9623 56 AA...
Страница 27: ...3 Installation 3 5 Spare parts and accessories 26 Typhoon Operating Instructions 28 9623 56 AA...
Страница 75: ...Appendix A Accessories A 4 Beamsplitters 74 Typhoon Operating Instructions 28 9623 56 AA...
Страница 76: ......