
Section 4 — Measurement Types and their Uses
88
Take Orbit Plot Measurement on Route
Before you take an orbit plot measurement on route you will need to
enable two sensors. To do this:
1.
Press
Options
.
2.
Press
Sensor Setup
.
3.
Enable two sensors > press
.
NOTE: Ideally the sensors used to take the measurements should
be displacement probes. This is because you are measuring the
physical movement of the shaft. If required, you can also take the
measurements with accelerometers (if no displacement probes are
available). These measure the movement of the bearing housing,
not the shaft.
To take an orbit plot measurement on route:
1.
Press
or
Route
.
2.
Select the route you have set up and imported from Ascent.
3.
Press
to toggle to the Axis/Point Mode to
Multi-Axis (X & Y for
Orbit
).
4.
Press the buttons on the left of the
Multi-Channel On Route
screen to
specify you X and Y axes.
5.
Press the buttons on the right of the
Multi-Channel On Route
screen
to specify all the other the axes you wish to record > Press
.
6.
Select the axis point you wish to take a recording for > Press
to
begin sampling.
7.
Press
again once the plot has stabilized — A single waveform
orbit measurement displays.
NOTE: Filtering is NOT supported on your instrument. You can use
Ascent for advanced analysis.
8.
Press
Save
to save the two waveform measurements used to
generate the orbit plot.
NOTE: You must specify the vertical and horizontal channels in
order to correctly view the orbit plot in Ascent.
NOTE: The circle icon indicates the start position of the waveform.
The triangle indicates the end.
Содержание SCOUT100-Ex
Страница 1: ...SCOUT vbSeries Instrument Reference Guide SCOUT100 Ex SCOUT140 Ex vb5 vb6 vb7 vb8 25 September 2014 ...
Страница 18: ...Section 1 Introduction 7 Installation Control Drawing for Hazardous Locations ...
Страница 20: ...Section 1 Introduction 9 Installation Control Drawing GE2214VBX for ATEX Hazardous Locations ...
Страница 21: ...Section 1 Introduction 10 IECEx ATEX Declaration of Conformity ...
Страница 40: ...Section 2 Instrument Fundamentals 29 Viewing hint labels Accessing more detailed help ...
Страница 44: ...Section 2 Instrument Fundamentals 33 Using the advanced options ...
Страница 54: ...Section 3 Sensors 43 Selecting the appropriate voltage for your tachometer and machine ...
Страница 85: ...Section 4 Measurement Types and their Uses 74 Selecting the required parameter settings ...
Страница 111: ...Section 4 Measurement Types and their Uses 100 Using the keypad to enter measurements ...
Страница 116: ...Section 4 Measurement Types and their Uses 105 Example of tracked measurement ...
Страница 120: ...Section 4 Measurement Types and their Uses 109 Saving multi channel measurements ...
Страница 124: ...Section 5 Set Measurement Options 113 Spectral lines submenu ...
Страница 164: ...Section 8 Send and Receive Information 153 Transferring recordings to Ascent ...
Страница 175: ...Section 8 Send and Receive Information 164 Selecting your Wi Fi region Creating a Wi Fi connection ...
Страница 194: ...Section 9 Working with Routes 183 Linear Speed ...
Страница 241: ...Section 11 Balancing Rotors 230 Splitting a weight ...
Страница 247: ...Section 12 Balancing Walkthrough 236 Taking an initial reading ...