Section 3 — Sensors
36
Set up Accelerometer
To set up your accelerometer:
1.
Plug the accelerometer connector into the BNC sensor input of your
instrument.
2.
Screw the accelerometer into the magnetic base.
3.
Attach the accelerometer to the measurement point using these
guidelines:
•
Attach the accelerometer to a sturdy, rigidly mounted, non-
flexible structure, where vibration from the rotating part of the
machine will be accurately transmitted.
•
Do NOT attach sensors to sheet metal, guards, or any machine
structure that is NOT closely coupled to the source of vibration
in the spinning rotor. The vibration of this kind of structure will
be different to the vibration source.
•
The attachment structure must be at least 10 times heavier
than the accelerometer itself. Do NOT mount the accelerometer
on lightweight motors or similar parts as the weight of the
accelerometer will distort the vibration signal. Use a smaller
accelerometer for small structures.
•
To avoid distorted signals, attach the accelerometer as closely
as possible to, and in line with, the centerline of the bearings.
•
The mounting surface should be flat and smooth where the
accelerometer makes contact. Attach the accelerometer using
the magnetic accelerometer base supplied or a threaded stud
on the machine surface. The accelerometer should NOT move
independently of the machine part it is attached to.
•
Ensure the accelerometer is oriented correctly. Vibration can
vary significantly with direction.
•
If you are undertaking an ongoing study of a particular
measurement point, always attach the accelerometer at exactly
the same position you used for previous measurements
TIP: Mark the position if necessary.
•
Keep the accelerometer clear from other cables to ensure it is
NOT twisted, kinked, or tangled.
Содержание SCOUT100-Ex
Страница 1: ...SCOUT vbSeries Instrument Reference Guide SCOUT100 Ex SCOUT140 Ex vb5 vb6 vb7 vb8 25 September 2014 ...
Страница 18: ...Section 1 Introduction 7 Installation Control Drawing for Hazardous Locations ...
Страница 20: ...Section 1 Introduction 9 Installation Control Drawing GE2214VBX for ATEX Hazardous Locations ...
Страница 21: ...Section 1 Introduction 10 IECEx ATEX Declaration of Conformity ...
Страница 40: ...Section 2 Instrument Fundamentals 29 Viewing hint labels Accessing more detailed help ...
Страница 44: ...Section 2 Instrument Fundamentals 33 Using the advanced options ...
Страница 54: ...Section 3 Sensors 43 Selecting the appropriate voltage for your tachometer and machine ...
Страница 85: ...Section 4 Measurement Types and their Uses 74 Selecting the required parameter settings ...
Страница 111: ...Section 4 Measurement Types and their Uses 100 Using the keypad to enter measurements ...
Страница 116: ...Section 4 Measurement Types and their Uses 105 Example of tracked measurement ...
Страница 120: ...Section 4 Measurement Types and their Uses 109 Saving multi channel measurements ...
Страница 124: ...Section 5 Set Measurement Options 113 Spectral lines submenu ...
Страница 164: ...Section 8 Send and Receive Information 153 Transferring recordings to Ascent ...
Страница 175: ...Section 8 Send and Receive Information 164 Selecting your Wi Fi region Creating a Wi Fi connection ...
Страница 194: ...Section 9 Working with Routes 183 Linear Speed ...
Страница 241: ...Section 11 Balancing Rotors 230 Splitting a weight ...
Страница 247: ...Section 12 Balancing Walkthrough 236 Taking an initial reading ...