489 GENERATOR MANAGEMENT RELAY – COMMUNICATIONS GUIDE
29
1777
FlexCurve™ Trip Time at 19.5
×
PU
0 to 65535
1
ms
F1
65535
1778
FlexCurve™ Trip Time at 20.0
×
PU
0 to 65535
1
ms
F1
65535
1779
Overcurrent Curve Multiplier
0 to 100000
1
–
F14
100
177B
Overcurrent Curve Reset
0 to 1
1
–
F201
0
CURRENT ELEMENTS / PHASE DIFFERENTIAL
17E0
Phase Differential Trip
0 to 2
1
–
F115
0
17E1
Assign Trip Relays (1-4)
0 to 3
1
–
F50
1
17E2
Differential Trip Minimum Pickup
5 to 100
1
×
CT
F3
10
17E3
Differential Trip Slope 1
1 to 100
1
%
F1
10
17E4
Differential Trip Slope 2
1 to 100
1
%
F1
20
17E5
Differential Trip Delay
0 to 100
1
cycles
F1
0
CURRENT ELEMENTS / GROUND DIRECTIONAL
1800
Supervise With Digital Input
0 to 1
1
–
F103
1
1801
Ground Directional MTA
0 to 3
1
–
F217
0
1802
Ground Directional Alarm
0 to 2
1
–
F115
0
1803
Assign Alarm Relays (2-5)
1 to 4
1
–
F50
16
1804
Ground Directional Alarm Pickup
5 to 2000
1
×
CT
F3
5
1805
Ground Directional Alarm Delay
1 to 1200
1
s
F2
30
1806
Ground Directional Alarm Events
0 to 1
1
–
F105
0
1807
Ground Directional Trip
0 to 2
1
–
F115
0
1808
Assign Trip Relays (1-4)
0 to 3
1
–
F50
1
1809
Ground Directional Trip Pickup
5 to 2000
1
×
CT
F3
5
180A
Ground Directional Trip Delay
1 to 1200
1
s
F2
30
CURRENT ELEMENTS / HIGH-SET PHASE OVERCURRENT
1830
High-Set Phase Overcurrent Trip
0 to 2
1
–
F115
0
1831
Assign Trip Relays (1-4)
0 to 3
1
–
F50
1
1832
High-Set Phase Overcurrent Pickup
15 to 2000
1
×
CT
F3
500
1833
High-Set Phase Overcurrent Delay
0 to 10000
1
s
F3
100
VOLTAGE ELEMENTS / UNDERVOLTAGE
2000
Undervoltage Alarm
0 to 2
1
–
F115
0
2001
Assign Alarm Relays (2-5)
1 to 4
1
–
F50
16
2002
Undervoltage Alarm Pickup
50 to 99
1
×
Rated
F3
85
2003
Undervoltage Alarm Delay
2 to 1200
1
s
F2
30
2004
Undervoltage Alarm Events
0 to 1
1
–
F105
0
2005
Undervoltage Trip
0 to 2
1
–
F115
0
2006
Assign Trip Relays (1-4)
0 to 3
1
–
F50
1
2007
Undervoltage Trip Pickup
50 to 99
1
×
Rated
F3
80
2008
Undervoltage Trip Delay
2 to 100
1
s
F2
10
2009
Undervoltage Curve Reset Rate
0 to 9999
1
s
F2
14
200A
Undervoltage Curve Element
0 to 1
1
–
F208
0
VOLTAGE ELEMENTS / OVERVOLTAGE
2020
Overvoltage Alarm
0 to 2
1
–
F115
0
2021
Assign Alarm Relays (2-5)
1 to 4
1
–
F50
16
2022
Overvoltage Alarm Pickup
101 to 150
1
×
Rated
F3
115
2023
Overvoltage Alarm Delay
1 to 1200
1
s
F2
30
2024
Overvoltage Alarm Events
0 to 1
1
–
F105
0
2025
Overvoltage Trip
0 to 2
1
–
F115
0
2026
Assign Trip Relays (1-4)
0 to 3
1
–
F50
1
2027
Overvoltage Trip Pickup
101 to 150
1
×
Rated
F3
120
2028
Overvoltage Trip Delay
1 to 100
1
s
F2
10
2029
Overvoltage Curve Reset Rate
0 to 9999
1
s
F2
14
202A
Overvoltage Curve Element
0 to 1
1
–
F208
0
VOLTAGE ELEMENTS / VOLTS/HERTZ
Table CG–1: 489 Memory Map (Sheet 17 of 30)
ADDR
Name
RANGE
STEP
UNITS
FORMAT
DEFAULT
1, 2, 3
See Table footnotes on page page 42
Содержание Multilin 489
Страница 2: ......
Страница 4: ...CGTOC II 489 GENERATOR MANAGEMENT RELAY COMMUNICATIONS GUIDE TABLE OF CONTENTS...