371
Description
IONet-EGD signal inputs are not being updated
Possible Cause
During commissioning or maintenance:
•
The I/O pack or module application process is not providing system signal inputs to EGD every frame.
Solution
During commissioning or maintenance:
•
Rebuild and download the firmware and application code.
•
Verify that the idle time is adequate for the I/O pack or module, and that the frame rate does not exceed defined limits.
•
If the problem persists, replace the I/O pack or module.
372
Description
Memory Validation failed - Data structures
Possible Cause
Hardware memory failure (process data that should not change after the controller goes online was
modified)
Solution
Replace the I/O pack or module.
373
Description
Firmware/IO Configuration Incompatible
Possible Cause
I/O pack or module configuration files are incompatible with the firmware (files do not contain
necessary revision)
Solution
During commissioning or maintenance:
•
Confirm the correct installation of the ToolboxST application.
•
Verify that each I/O pack or module is upgraded to the latest version by right-clicking each I/O pack or module and
selecting
Upgrade
.
•
Rebuild the application, and download the firmware and application code to the affected I/O pack or module.
During normal operation:
•
Replace the I/O pack or module.
445
Description
Incorrect or Missing Acquisition Board on HSSL link 1
Possible Cause
The acquisition board on High Speed Serial Link 1 is not connected or does not agree with the
ToolboxST configuration.
Solution
•
Verify that the correct acquisition board is connected to the specified HSSL connector on the UCSA.
•
Verify that the ToolboxST configuration for the appropriate HSSL connector matches the hardware.
470
GEH-6855_Vol_II
GEH-6855_Vol_II Mark VIeS Functional Safety Systems Volume II
Public Information
Содержание Mark VIeS
Страница 16: ...Notes 16 GEH 6855_Vol_II GEH 6855_Vol_II Mark VIeS Functional Safety Systems Volume II Public Information ...
Страница 84: ...Notes 84 GEH 6855_Vol_II GEH 6855_Vol_II Mark VIeS Functional Safety Systems Volume II Public Information ...
Страница 114: ...Notes 114 GEH 6855_Vol_II GEH 6855_Vol_II Mark VIeS Functional Safety Systems Volume II Public Information ...
Страница 130: ...Notes 130 GEH 6855_Vol_II GEH 6855_Vol_II Mark VIeS Functional Safety Systems Volume II Public Information ...
Страница 145: ...TRLYS1B Terminal Board Wiring YDOA Discrete Output Modules GEH 6855_Vol_II System Guide 145 Public Information ...
Страница 153: ...TRLYS1D Circuits TMR YDOA Discrete Output Modules GEH 6855_Vol_II System Guide 153 Public Information ...
Страница 157: ...TRLYS1F Terminal Board Wiring YDOA Discrete Output Modules GEH 6855_Vol_II System Guide 157 Public Information ...
Страница 210: ...210 GEH 6855_Vol_II GEH 6855_Vol_II Mark VIeS Functional Safety Systems Volume II Public Information ...
Страница 226: ...Notes 226 GEH 6855_Vol_II GEH 6855_Vol_II Mark VIeS Functional Safety Systems Volume II Public Information ...
Страница 284: ...Notes 284 GEH 6855_Vol_II GEH 6855_Vol_II Mark VIeS Functional Safety Systems Volume II Public Information ...
Страница 369: ...JPDE Photo PDM Power Distribution Modules GEH 6855_Vol_II System Guide 369 Public Information ...
Страница 396: ...JGND Mounting 396 GEH 6855_Vol_II GEH 6855_Vol_II Mark VIeS Functional Safety Systems Volume II Public Information ...
Страница 440: ...Notes 440 GEH 6855_Vol_II GEH 6855_Vol_II Mark VIeS Functional Safety Systems Volume II Public Information ...
Страница 476: ...Notes 476 GEH 6855_Vol_II GEH 6855_Vol_II Mark VIeS Functional Safety Systems Volume II Public Information ...
Страница 485: ......
Страница 486: ...Public Information ...