6.2.8 T8 – GROUND TIME OVERCURRENT TEST
1.
Protection Settings:
OVERCURRNT
(601)
50 = YES
(605)
50G = YES
(610)
51G = YES
(611)
51G_DIRCNL = NO
(612)
51GPICKUP = [________] Amps
(614)
51GCURVE = [________] Curve
(615)
51GTIMDIAL = [________] Time dial
(617)
51G_RESET = FAST
The 51G function is calculated with the equation:
51G = 3
I
0
(eq. 6–4)
where
I
0
is equal to the zero-sequence current. Since
I
op
is single phase,
I
0
is given by
Substituting Equation 6–5 into Equation 6–4 yields:
I
op
= 51G
Therefore, 51G will pick up when
I
op
≥
51GPICKUP. The time it takes for 51G to pick up is determined by
the time-dial curves shown in Section 2.4: INVERSE CURVES on page 2–29.
CAUTION: If the test current exceeds 2
I
n
(where
I
n
is the rated current), then the current test
should be applied with a 50% duty cycle. For instance, if the current is applied for 5
minutes, it should be left off for 5 minutes before it is reapplied.
2.
Connect the relay as shown in Figure 4–3: PHASE TO GROUND TEST CONNECTIONS on page 4–16.
NOTE: Start the timer when
I
op
is applied, and stop the timer when A1 closes (the relay trips).
3.
For this test remove the relay from test mode and assign TOCTRP to A1.
(2007) A1 = index 119; TOCTRP
4.
Apply
I
op
at 2 x 51PICKUP = [________] A rms and start the timer. Leave the current on until the A1 con-
tact close then stop the timer. The time should be within ±7% of the value found in the time current charac-
teristic in use.
5.
Reduce
I
op
to zero.
6.
Repeat steps 4. and 5. for
I
op
at 6 x 51PICKUP = [________] A rms and 10 x 51PICKUP = [________] A
rms. Verify that the times are within ±7% of the value found in the time current characteristic in use.
6.2.9 T9 – UNDERVOLTAGE TEST
This test has fixed settings that are not user selectable. See Section 5.1.10: T9 – UNDERVOLTAGE TEST on
page 5–8 for testing with factory settings.
I
0
I
op
3
-------
=
(eq. 6–5)
Содержание LPS-O
Страница 2: ......
Страница 4: ......
Страница 14: ...x LPS O Line Protection System GE Power Management TABLE OF CONTENTS ...
Страница 40: ...1 26 LPS O Line Protection System GE Power Management 1 10 ELEMENTARY DIAGRAM 1 PRODUCT DESCRIPTION 1 ...
Страница 112: ...3 16 LPS O Line Protection System GE Power Management 3 3 PRINTED CIRCUIT BOARD MODULES 3 HARDWARE DESCRIPTION 3 ...
Страница 166: ...6 16 LPS O Line Protection System GE Power Management 6 4 BACKUP PROTECTION TESTS 6 FUNCTIONAL TESTS USER SETTINGS 6 ...
Страница 200: ...8 32 LPS O Line Protection System GE Power Management 8 4 REMOTE COMMUNICATION INTERFACE 8 LOCAL USER INTERFACE 8 ...
Страница 208: ...9 8 LPS O Line Protection System GE Power Management 9 3 TROUBLESHOOTING 9 SERVICING 9 ...
Страница 226: ...10 18 LPS O Line Protection System GE Power Management 10 8 HELP MENU 10 ALPS TEST PROGRAM 10 ...
Страница 280: ...13 18 LPS O Line Protection System GE Power Management 13 4 CREATING XPRESSION BUILDER LOGIC 13 XPRESSION BUILDER 13 ...
Страница 284: ...A 4 LPS O Line Protection System GE Power Management A 1 FREQUENTLY ASKED QUESTIONS APPENDIXA A ...
Страница 288: ...B 4 LPS O Line Protection System GE Power Management B 2 FIGURES APPENDIXB B ...
Страница 292: ...C 4 LPS O Line Protection System GE Power Management C 1 KEYPAD MENUS APPENDIXC C ...
Страница 294: ...D 2 LPS O Line Protection System GE Power Management D 1 WARRANTY INFORMATION APPENDIXD D ...
Страница 306: ...xii LPS O Line Protection System GE Power Management INDEX INDEX ...
Страница 307: ...GE Power Management LPS O Line Protection System NOTES ...