JOB CARD PIST044–001 – Innova 2000 System Interconnect
15
8 of 10
12
13
5-5
Run the cables for Extra monitors
The extra monitors are delivered with their respective composites cables:
These two options are independent.
The cable includes video cable, ground cable and power cable.
The cable is 24 meters length.
The cable could be extended with the same option than the 3 monitor suspension.
Cables are connected to the ACAB bulkhead.
5-6
Run the cable Set Group 3
Group 3 links the technical area cabinets to the technical area cabinets.
The cable set is delivered in the box
3
Illustration 1, each cable is individual:
ACAB and POSTIT shall be close to each other, length reference is ACAB entrance.
MPPU1 and MPPU2 shall be close to each other.
Chiller and conditioner shall be at 6 meters maximum from their control subsystem.
Use the cable rings to run the different cables on subsystems in conformity with the subsystem
color coded (See Section 4).
Set of cables includes:
2 cables between MPPU and Chiller.
3 cables between MPPU and POSTIT Cabinets.