Innova 2000 Cardiovascular Imaging System
GE Medical Systems
Pre–Installation Manual
REV 5
pim 2337741–100
144
JOB CARD PIST044–001 – Innova 2000 System Interconnect
9
2 of 10
5
PROCEDURE
5-1
Unpack the spools
The cables sets are delivered on a pallet, lengths were defined during ordering process, with the
cable select process. The pallet includes group 1
1
under group 2
2
on two independent spools,
the group 3
3
is delivered in a separate box. The pallet could be used as a tool, to unspool the cables
sets. This tool
4
includes the axis
5
, the two wooden forms
6
and the support
7
.
THE SPOOLS ARE VERY HEAVY, YOU MUST FOLLOW THE FOLLOWING
PROCEDURE TO UNWIND THE CABLES.
Illustration 1 –
1
2
3
4
5
6
7
The axis
5
shall be extracted from the spools.
The group 3
3
box shall be put in an other area.
The upper spool shall be slided down by hands (avoid lifting the full load).
The lower spool shall be slided down by hands (avoid lifting the full load).
WARNING