7 Repair procedures
TRM, Centiva/5 Plus, M1047448/CM-922026, rev. 3.50.a
7-31
7.9.3 Repair expiratory
valve locking assembly
The Centiva/5 Plus CC Ventilator is equipped with an expiration valve locking
mechanism that uses a motor driven locking system to properly fix the expiration
valve inside the system. To remove the expiration valve locking assembly:
1.
Remove the expiration valve according to section 7.2.1.
2.
Remove the control panel according to section 7.2.2.
3.
Remove the panel mounting plate according to section 7.2.6.
4.
Open the main engine according to section 7.2.5.
5.
Remove back-up battery according to section 7.9.1.
6.
Disconnect X 42 on PC board B.
7.
Disconnect the ground connection at the front of the assembly.
8.
Disconnect tube A from the expiration valve locking assembly (left side).
NOTE: Check caution note in section 7.1. !
9.
Disconnect “patient” tube at the inspiratory connection.
10.
Unscrew three screws at the bottom of the assembly, one on the left side, two
on the right side.
11.
Remove the entire assembly by lifting it up and to the right.
12.
When inserting the assembly place the three screws into the assembly before
placing it into the system.
13.
Fix the three screws at the bottom of the assembly.
14.
Reconnect “patient” tube at the inspiratory connection.
15.
Reconnect tube A to the expiration valve locking assembly. NOTE: Check
caution note in section 7.1. !
16.
Reconnect the ground connection at the front of the assembly.
17.
Reconnect X 42 on PC board B.
18.
Insert back-up battery according to section 7.9.1.
19.
Close the main engine; add the control panel and expiratory valve.
20.
Verify proper function after reassembly by performing a power-up test.
Содержание Centiva/5 Plus
Страница 1: ...GE Healthcare Centiva 5 Plus Technical Reference Manual ...
Страница 14: ...1 Introduction TRM Centiva 5 Plus M1047448 CM 922026 rev 3 50 a of 11 05 1 8 Notes ...
Страница 20: ...2 Theory of operation TRM Centiva 5 Plus M1047448 CM 922026 rev 3 50 a of 11 05 2 6 ...
Страница 27: ...2 Theory of operation TRM Centiva 5 Plus M1047448 CM 922026 rev 3 50 a of 11 05 2 13 ...
Страница 30: ...2 Theory of operation TRM Centiva 5 Plus M1047448 CM 922026 rev 3 50 a of 11 05 2 16 Notes ...
Страница 34: ...3 Post service check out TRM Centiva 5 Plus M1047448 CM 922026 rev 3 50 a of 11 05 3 4 Notes ...
Страница 70: ...4 Test and calibration TRM Centiva 5 Plus M1047448 CM 922026 rev 3 50 a of 11 05 4 36 Notes ...
Страница 154: ...7 Repair procedures TRM Centiva 5 Plus M1047448 CM 922026 rev 3 50 a 7 48 Notes ...
Страница 178: ...9 Schematics and Diagrams TRM Centiva 5 Plus M1047448 CM 922026 rev 3 50 a of 11 05 9 2 9 1 Pneumatic diagram ...
Страница 180: ...9 Schematics and Diagrams TRM Centiva 5 Plus M1047448 CM 922026 rev 3 50 a of 11 05 9 4 9 2 Electrical diagram ...
Страница 181: ...9 Schematics and Diagrams TRM Centiva 5 Plus M1047448 CM 922026 rev 3 50 a of 11 05 9 5 ...
Страница 182: ...9 Schematics and Diagrams TRM Centiva 5 Plus M1047448 CM 922026 rev 3 50 a of 11 05 9 6 9 3 Component layout PC board B ...
Страница 183: ...9 Schematics and Diagrams TRM Centiva 5 Plus M1047448 CM 922026 rev 3 50 a of 11 05 9 7 9 4 Component layout PC board A ...
Страница 192: ...9 Schematics and Diagrams TRM Centiva 5 Plus M1047448 CM 922026 rev 3 50 a of 11 05 9 16 Notes ...
Страница 206: ...10 Configuration and optionalization TRM Centiva 5 Plus M1047448 CM 922026 rev 3 50 a of 11 05 10 14 Notes ...
Страница 212: ...11 Optional accessories TRM Centiva 5 Plus M1047448 CM 922026 rev 3 50 a of 11 05 11 6 Notes ...
Страница 213: ...TRM Centiva 5 Plus M1047448 CM 922026 rev 3 50 a of 11 05 Notes ...