Installation
3-3
3.2.3.
Power Supply Requirement
Voltage: AC 100V/110V/120V|200V|220V/230V/240V
±
10%
Frequency: 50Hz/60Hz
±
3Hz
Rated Momentary Line Current (shorter than 5s):
•
30A (100V/110V/120V)
•
28A (200V)
•
25A (220V/230V/240V)
Rated Continuous Line Current:
•
20A (100V/110V/120V)
•
12A (200V)
•
10A (220V/230V/240V)
Maximum line impedance: 0.3
Ω
|0.6
Ω
|0.6
Ω
Max Line Regulation (Percent): 15% at maximum radiographic exposure.
Line regulation is based on measurements made at the input (primary winding) of the isolation
transformer under standby conditions and at maximum radiographic exposure by the following equation:
Line regulation = 100 (Vn - V1)/V1
Where Vn = no load voltage (standby), and V1 = loaded voltage (maximum radiographic exposure).
16A power supply is required in China. And 20 A is required in Japan.
Suitable sockets are required both in Scan room and Operating room for maintenance.
Power supply should comply with requirement of the system power supply requirements.
The sockets should be 3 cores with protective earth, which complies with the requirement
of the applicable electrical codes. Other equipment electrically connected with this
apparatus shares the same grounding connection.
You should check the local power supply first. If it is not 200 V/220 V/230 V/240 V (50 Hz),
you need change the power supply cables and change the connections of the system.
Refer to the Power Supply Adaptation section3.5.1 for details.
3.2.4.
Environments
Operating Conditions:
Temperature: +10
°
C~+40
°
C
(
+50F~+104F
)
Humidity: 20%~80% Relative, non-condensing
Atmospheric Pressure: 700hPa~1060hPa
Transportation and Storage:
Temperature: -20
°
C~+55
°
C (-4F~+131F)
Humidity: 10%~95% Relative, non-condensing
Atmospheric Pressure: 500hPa~1060hPa
WARNING
Содержание Brivo OEC 715
Страница 2: ......
Страница 19: ...Chapter1 Introduction and Safety...
Страница 41: ...Introduction and Safety 23 46 54 20 18 26...
Страница 55: ...Chapter2 System Overview...
Страница 137: ...Chapter3 Installation...
Страница 147: ...Installation 3 11 7 Put the ramp in position Release all bracket and move the workstation along the ramp off the pallet...
Страница 211: ...Installation 3 75 3 9 Reporting For U S Systems Complete and submit Form 2579 within 15 days of installation...
Страница 212: ...Chapter4 Calibration...
Страница 223: ...Brivo OEC 715 785 865 Mobile C Arm X Ray Product Service Manual 4 12 Mainframe Control Board TP7...
Страница 231: ...Brivo OEC 715 785 865 Mobile C Arm X Ray Product Service Manual 4 20 Mainframe Control Board TP17 POT4 J5 TP7 POT7 POT5...
Страница 275: ...Brivo OEC 715 785 865 Mobile C Arm X Ray Product Service Manual 4 64...
Страница 284: ...Chapter5 Software...
Страница 312: ...Software 5 29 4 Click Next 5 Click Install 6 Click Finish button to complete installation procedure...
Страница 326: ...Software 5 43 2 Click on install to continue 3 Click Next to continue...
Страница 335: ...Chapter6 Troubleshooting...
Страница 408: ...Chapter7 Replacement...
Страница 418: ...Replacement 7 11 166...
Страница 488: ...Chapter8 Periodic Maintenance...
Страница 502: ...Periodic Maintenance 8 15...
Страница 505: ...Chapter9 Technical Reference...
Страница 520: ...Brivo OEC 715 785 865 Mobile C Arm X Ray Product Service Manual 9 16 Lateral configuration 1 5m Lateral configuration 1m...
Страница 521: ...Technical Reference 9 17 Vertical configuration 1 5m Vertical configuration 1m...
Страница 526: ...11 Appendix System Schematics...