Step
Action
5
Carefully disconnect and lift off the air trap level sensor fixture, level sen-
sors, lever, and the strap from the disposable air trap. These items are re-
usable and must not be removed from the system
NOTICE
Do not remove the level sensor fixture, level sensors,
lever, and the strap from the system. These items are
reusable parts of the system.
6
Make sure to fit caps to all sensor connections on the system with the caps
provided on the system.
7
Set the switch to Flowkit install to open the pinch valves.
8
Remove the flow kit sections starting from the outlet/column side by
opening the pinch valves locking pins one by one as the tubing is removed
from the valve. Close each valve after the tubing is removed.
9
Dispose of the flow kit sections in accordance with local regulations.
Shutdown procedure
The example below describes the shutdown procedure for UNICORN software.
For other control softwares, refer to the software documentation.
Step
Action
1
In UNICORN, select File
→
Exit UNICORN in any module, or select File
→
Quit Program in UNICORN Manager, depending on the UNICORN ver-
sion used.
2
When the touchscreen monitor has switched off, turn off the Power
switch.
Note:
For LOTO make sure to immobilize the power switch by inserting the pad-
lock into the power switch locking hole.
6 Operation
6.3 Controlled shutdown and removal of flow kit
142
ÄKTA ready XL Operating Instructions 29281616 AE
*** TeDIS Valid on Date Printed Printed on: 15-09-2023 11:27:35 ***