power
cord.
Order
the
power
cords
that
match
the
device.
Always
connect
the
power
cords
to
grounded
power
outlets.
When
using
an
expansion
rack,
be
sure
to
use
the
supplied
power
cords.
To
confirm
the
type
of
power
supplied
by
the
building,
contact
the
facility
administrator
or
a
certified
electrician.
■
For
three-phase
input
No
power
cord
is
supplied
for
three-phase
input.
Grounded
power
cords
must
be
connected
from
the
distribution
panel
directly
to
the
terminal
boards
of
power
supply
chassis
as
part
of
local
electrical
work.
When
using
an
expansion
rack,
be
sure
to
use
the
supplied
power
cords.
Although
common
grounding
is
possible
with
this
device,
grounding
methods
vary
depending
on
the
building
of
the
installation.
When
using
common
grounding,
ground
devices
such
that
the
grounding
resistance
is
equal
to
or
less
than
10
ohms.
Be
sure
to
have
the
facility
administrator
or
a
certified
electrician
confirm
the
grounding
method
for
the
building
and
perform
the
grounding
work.
Do
not
connect
to
an
IT
power
system.
2.10
Checking
External
Interface
Port
Specifications
This
section
provides
an
overview
of
the
specifications
of
the
external
interface
ports
required
in
installation
and
operation
of
the
SPARC
M10
systems.
You
can
use
the
following
external
interface
ports
on
the
SPARC
M10
systems.
XSCF
unit
administration
port
■
Serial
port
The
eXtended
System
Control
Facility
(XSCF)
has
one
RS-232C-compliant
serial
port.
You
can
monitor
and
control
the
system
by
connecting
the
system
management
terminal
to
the
serial
port.
Functions
that
require
TCP/IP
are
not
available
through
the
serial
port.
■
XSCF-LAN
port
In
addition
to
the
serial
port,
the
XSCF
has
two
1000BASE-T
LAN
ports.
You
can
remotely
monitor
and
control
the
system
by
configuring
a
system
control
network
using
a
LAN
port.
There
are
two
types
of
interfaces
available:
a
command-line
interface
(XSCF
shell)
and
a
browser
user
interface
(XSCF
Web).
Do
not
make
a
connection
with
a
network
switch
or
hub
until
you
complete
the
network
setting
for
the
XSCF.
If
a
connection
is
made
before
the
completion
of
the
setting,
devices
connecting
with
others
may
become
unable
to
communicate,
or
unauthorized
login
by
a
malicious
third
party
to
the
XSCF
of
this
chassis
may
be
unable
to
be
prevented.
Fujitsu
M10/SPARC
M10
Systems
Installation
Guide
・
July
2015
62
Содержание M10 Series
Страница 1: ...Fujitsu M10 SPARC M10 Systems Installation Guide Manual Code C120 E678 12EN July 2015 ...
Страница 10: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 x ...
Страница 156: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 142 ...
Страница 169: ...A B Figure 4 14 Locations for passing cables between the racks Chapter 4 Configuring Building Block Connections 155 ...
Страница 176: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 162 ...
Страница 208: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 194 ...
Страница 240: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 226 ...
Страница 252: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 238 ...
Страница 290: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 276 ...
Страница 310: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 296 ...
Страница 336: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 322 ...
Страница 368: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 354 ...
Страница 374: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 360 ...