XSCF>
showboards
-p
0
PSB
PPAR-ID(LSB)
Assignment
Pwr
Conn
Conf
Test
Fault
----
------------
-----------
----
----
----
-------
--------
00-0
00(00)
Assigned
y
y
y
Passed
Normal
01-0
00(01)
Assigned
y
y
y
Passed
Normal
XSCF>
console
-p
0
#
ldm
list-domain
NAME
STATE
FLAGS
CONS
VCPU
MEMORY
UTIL
UPTIME
primary
active
-n-cv-
UART
32
28G
0.0%
2h
3m
guest0
active
-n----
5100
64
64G
3.1%
33m
root-dom0
active
-n--v-
5000
32
32G
3.1%
47m
11.
Check
the
operation
status
of
logical
domains.
a.
Execute
the
console
command
to
connect
to
the
console
of
the
control
domain,
and
then
log
in.
b.
Execute
the
ldm
list-domain
command,
and
confirm
that
the
operation
status
of
the
logical
domains
has
not
changed
after
the
system
board
(PSB)
addition.
Check
the
operation
status
of
the
logical
domains
through
the
combination
of
[STATE]
and
[FLAGS].
When
[STATE]
is
"active,"
the
second
character
from
the
left
of
the
string
in
[FLAGS]
has
one
of
the
following
meanings:
"n":
Oracle
Solaris
operating
"t":
OpenBoot
PROM
state
"-":
Another
state
(including
cases
in
which
STATE
is
not
active)
12.
Reconfigure
the
logical
domains.
Assign
the
resources
of
the
installed
SPARC
M10-4S
to
an
existing
logical
domain
or
a
newly
configured
logical
domain.
For
details,
see
the
Fujitsu
M10/SPARC
M10
Systems
Domain
Configuration
Guide
.
After
the
reconfiguration,
execute
the
ldm
add-spconfig
command
to
save
the
logical
domain
configuration
in
the
XSCF.
9.2.2
Installing
the
server
after
stopping
the
target
physical
partition
(PPAR)
This
section
describes
the
SPARC
M10-4S
installation
procedure
for
expanding
a
2BB
configuration
to
a
3BB
configuration
after
stopping
the
target
physical
partition
(PPAR).
Stop
applications
in
guest
domains
as
required.
For
details
on
the
XSCF
commands
executed
in
each
step,
see
the
Fujitsu
M10/SPARC
M10
Systems
XSCF
Reference
Manual
.
Fujitsu
M10/SPARC
M10
Systems
Installation
Guide
・
July
2015
250
Содержание M10 Series
Страница 1: ...Fujitsu M10 SPARC M10 Systems Installation Guide Manual Code C120 E678 12EN July 2015 ...
Страница 10: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 x ...
Страница 156: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 142 ...
Страница 169: ...A B Figure 4 14 Locations for passing cables between the racks Chapter 4 Configuring Building Block Connections 155 ...
Страница 176: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 162 ...
Страница 208: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 194 ...
Страница 240: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 226 ...
Страница 252: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 238 ...
Страница 290: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 276 ...
Страница 310: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 296 ...
Страница 336: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 322 ...
Страница 368: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 354 ...
Страница 374: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 360 ...