2.4.6
Points
of
concern
when
bringing
in
an
expansion
rack
This
section
describes
the
points
of
concern
when
an
expansion
rack
or
the
server
product
is
brought
in.
■
Before
bringing
in
an
expansion
rack,
confirm
that
the
access
route
is
wide
enough
for
the
rack
package
(Eco
package:
W
700
x
D
1,050
x
H
2,000
mm,
ordinary
package:
W
1,260
x
D
1,264
x
H
2,160
mm).
The
expansion
rack
is
shipped
with
both
the
SPARC
M10-4S
and
crossbar
boxes
mounted
in
the
rack.
If
it
is
difficult
to
bring
in
the
rack
while
still
packed,
unpack
it
as
needed
to
bring
it
in.
■
If
the
access
route
has
steps,
a
ramp
may
be
necessary.
Chapter
2
Planning
and
Preparing
for
System
Installation
35
Содержание M10 Series
Страница 1: ...Fujitsu M10 SPARC M10 Systems Installation Guide Manual Code C120 E678 12EN July 2015 ...
Страница 10: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 x ...
Страница 156: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 142 ...
Страница 169: ...A B Figure 4 14 Locations for passing cables between the racks Chapter 4 Configuring Building Block Connections 155 ...
Страница 176: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 162 ...
Страница 208: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 194 ...
Страница 240: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 226 ...
Страница 252: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 238 ...
Страница 290: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 276 ...
Страница 310: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 296 ...
Страница 336: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 322 ...
Страница 368: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 354 ...
Страница 374: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 360 ...