
Note
-
For
the
initialization
of
the
chassis
of
the
master
XSCF,
perform
that
work
at
the
end.
Execute
the
restoredefaults
-c
factory
command
to
return
to
the
factory
defaults,
including
the
CPU
Activation
key
information.
Perform
this
work
with
a
serial
connection
to
the
master
XSCF.
For
XCP
2041
or
later,
execute
the
restoredefaults
-c
factory
-r
activation
command.
The
key
must
be
reinstalled
at
initial
setup
of
the
XSCF
after
installation.
8.
Remove
the
power
cords
from
the
power
supply
units
of
the
target
SPARC
M10-4S.
9.
Remove
the
XSCF
BB
control
cables
from
the
target
SPARC
M10-4S.
10.
Remove
the
crossbar
cables
from
the
target
SPARC
M10-4S.
11.
If
the
removal
changes
the
configuration
to
the
1BB
configuration,
remove
the
XSCF
DUAL
control
cable.
12.
Remove
the
target
SPARC
M10-4S
from
the
rack.
Remove
the
SPARC
M10-4S
from
the
rack
by
reversing
the
mounting
procedure.
For
the
procedure
for
mounting
in
the
rack,
see
"
9.3.2
Installing
expansion
rack
1
This
section
describes
the
procedure
for
connecting
power
cords
to
a
power
distribution
unit
(PDU)
of
the
expansion
rack
and
then
installing
the
rack.
1.
Confirm
the
delivered
components
of
expansion
rack
1.
For
details,
see
."
2.
Before
installing
the
rack,
connect
the
power
cords
to
a
power
distribution
unit
(PDU)
of
the
rack.
For
details,
see
."
3.
Install
expansion
rack
1.
For
details,
see
9.3.3
Installing
the
SPARC
M10-4S
in
expansion
rack
1
In
the
expansion
rack
1
installed
in
mount
the
SPARC
M10-4S
that
was
changed
to
1BB
configurations
in
.
Then,
perform
installation
work.
1.
Mount
the
SPARC
M10-4S
in
the
rack.
For
details,
see
."
2.
Set
the
ID
required
for
identifying
each
chassis
(BB-ID).
For
details,
see
."
3.
Connect
the
crossbar
cables
and
XSCF
BB
control
cables
to
each
chassis.
Crossbar
cables
(optical)
and
XSCF
BB
control
cables
are
already
laid
in
the
expansion
rack.
The
work
here
is
to
connect
the
cables
to
each
port
of
the
Fujitsu
M10/SPARC
M10
Systems
Installation
Guide
・
July
2015
268
Содержание M10 Series
Страница 1: ...Fujitsu M10 SPARC M10 Systems Installation Guide Manual Code C120 E678 12EN July 2015 ...
Страница 10: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 x ...
Страница 156: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 142 ...
Страница 169: ...A B Figure 4 14 Locations for passing cables between the racks Chapter 4 Configuring Building Block Connections 155 ...
Страница 176: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 162 ...
Страница 208: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 194 ...
Страница 240: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 226 ...
Страница 252: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 238 ...
Страница 290: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 276 ...
Страница 310: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 296 ...
Страница 336: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 322 ...
Страница 368: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 354 ...
Страница 374: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 360 ...