
XSCF>
poweron
-y
-a
XSCF>
showpparstatus
-p
0
PPAR-ID
PPAR
Status
00
Running
XSCF>
showboards
-p
0
PSB
PPAR-ID(LSB)
Assignment
Pwr
Conn
Conf
Test
Fault
----
------------
-----------
----
----
----
-------
--------
00-0
00(00)
Assigned
y
y
y
Passed
Normal
01-0
00(01)
Assigned
y
y
y
Passed
Normal
02-0
00(02)
Assigned
y
y
y
Passed
Normal
24.
Execute
the
showpparstatus
command
to
check
the
operation
status
of
the
physical
partition.
In
the
following
example,
the
[PPAR
Status]
field
displays
"Running,"
so
the
physical
partition
is
operating
correctly.
25.
Execute
the
showboards
command
to
check
the
system
board
(PSB)
status.
In
the
following
example,
since
both
the
[Conn]
and
[Conf]
fields
display
"y"
for
system
board
02-0,
the
system
board
(PSB)
has
been
added
correctly.
26.
Reconfigure
the
logical
domains.
Assign
the
resources
of
the
installed
SPARC
M10-4S
to
an
existing
logical
domain
or
a
newly
configured
logical
domain.
For
details,
see
the
Fujitsu
M10/SPARC
M10
Systems
Domain
Configuration
Guide
.
9.3
Adding
Expansion
Rack
1
(Installation
for
Expansion
to
Up
to
the
8BB
Configuration)
This
section
describes
the
installation
procedure
for
expansion
of
direct
connections
between
chassis
in
a
configuration
of
up
to
the
4BB
configuration
to
connections
through
crossbar
boxes
in
a
configuration
of
up
to
the
8BB
configuration.
This
procedure
corresponds
to
pattern
B
(1)
in
.
9.3.1
Changing
a
multiple-BB
configuration
into
1BB
configurations
and
releasing
their
connections
Remove
the
SPARC
M10-4S
from
the
existing
multiple-BB
configuration
(direct
connections
between
chassis),
change
it
to
1BB
configurations,
and
release
their
Chapter
9
Installing
a
System
with
a
Building
Block
Configuration
265
Содержание M10 Series
Страница 1: ...Fujitsu M10 SPARC M10 Systems Installation Guide Manual Code C120 E678 12EN July 2015 ...
Страница 10: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 x ...
Страница 156: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 142 ...
Страница 169: ...A B Figure 4 14 Locations for passing cables between the racks Chapter 4 Configuring Building Block Connections 155 ...
Страница 176: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 162 ...
Страница 208: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 194 ...
Страница 240: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 226 ...
Страница 252: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 238 ...
Страница 290: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 276 ...
Страница 310: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 296 ...
Страница 336: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 322 ...
Страница 368: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 354 ...
Страница 374: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 360 ...