![Fuji Electric Time Delta-C FSV-2 Скачать руководство пользователя страница 13](http://html1.mh-extra.com/html/fuji-electric/time-delta-c-fsv-2/time-delta-c-fsv-2_instruction-manual_2341899013.webp)
-6-
2. OPERATION PREPARATION
2.1. Outline of installation procedure
Install the flowmeter according to the following procedure.
Installation of flow transmitter
Flow transmitter wiring
Power
ON
*
Check the power supply specifications and wiring before
turning on the power. (Refer to “1.3.Check on type and
specifications”.)
* Metric system is selected for unit.
*
Switching measurement mode
The initial display language is English. Switch the languages
as required.
NG
When Y or C is selected for the 12th digit
Checking and Setting of Piping
Specifications/Detector
Piping parameter setting method
OK
When A or B is selected for the
12th digit
*
Be careful not to mount the sensor units with wrong mounting
dimension. Mount it with the dimension displayed at the
process setting of the piping parameter. (Refer to “5.
MOUNTING OF DETECTOR”.)
NG (LED display is red)
Section 6.5.1.3 Checking the RAS information
Displaying the data in
maintenance mode
OK
(LED display is green)
Displaying the data in
maintenance mode
Check the data display
Check the data display
AGC U
AGC
D
45% or more
AGC U
P/H U
AGC
D
45% or more
P/H
D
Outside the range
of 5528 to 6758
P/H
P/H
D
5528 to 6758
Contact Fuji Electric’s service representative.
*
Before performing zero point adjustment, check that the pipe
is filled with fluid, the fluid is in still state, and that the
measurement status is normal.
Basic
operation
*
Section 4.12.2
Section 4.12.3
Section
4.12.1.1
Flow rate range (single range)
Section 4.12.3.1
Section
4.12.1.4
Analog output at error (Burnout)
Section 4.12.4
Check A, B for
the 12th digit of
code symbol
only.
Application
operation
Section 4.12.1 Setting of flow rate range
Section 4.13.1 Automatic 2 ranges
Section 4.13.5.2
Section 4.13.2 Bi-directional range
Section 4.13.5.3 Flow switch
Section 4.13.3 Bi-directional auto 2 range
Section 4.13.5.4 Total switch
Run
(Measurement)
Note) Set the parameter protection to OFF before you change settings or perform zero adjustment.
Содержание Time Delta-C FSV-2
Страница 1: ......
Страница 131: ...124 7 APPENDIX 7 1 Specifications...
Страница 132: ...125...
Страница 133: ...126...
Страница 149: ......