
MT6M15962a
5. Timing chart
© Fuji Electric Co., Ltd. All rights reserved.
5.1 Control power supply under voltage protection (UV)
5.1.1 Operation when
V
CC
is turned on and
V
in
is High (OFF). (operation (1)~(4))
• During
V
CC
startup, an alarm signal is output when
V
CC
exceeds 5V and becomes lower than
V
UV
. (1)
The protection is not activated regardless of whether the
V
in
signal is in ON/OFF state if the period
during which
V
CC
is lower than
V
UV
is shorter than
20μs. (2)
• The alarm signal is output about 20μs after
V
CC
drops below
V
UV
.
While
V
in
is OFF, the IGBT is kept in the OFF-state. (3)
• UV protection operation continues during the
t
ALM(UV)
period if
V
CC
returns to
V
UV
+
V
H
before
t
ALM(UV)
elapses. (3)~(4)
When
V
in
is OFF, normal operation is resumed after
t
ALM(UV)
has elapsed. (4)
• Even if the protection operating duration is sufficiently longer than
t
ALM(UV)
, the alarm signal is output
only once.
3-12
Fig. 3-6 UV protection operation ((1)~(4))
V
CC
: Supply voltage of pre-driver
V
UV
: Under voltage protection level
V
H
: Under voltage protection hysteresis
V
in
: Input signal voltage
V
ALM
: Alarm signal voltage
t
ALM(UV)
: Alarm signal hold time
Protected
operation