Table of contents
Qualification of assembly staff
Personal protective equipment for assembly staff
Qualification of operating staff
Protective equipment for operating staff
Requirements at the installation site
Information about the fuel store
Installing the discharge system
Materials supplied with discharge screw
Materials supplied with rotary agitator
Installing the discharge screw
Aligning the trough of the discharge screw
Securing the adjustable feet and support elements
Setting the tension of the torsion springs
Connecting the sprinkler system
Table of contents
2
Froling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.com