❒ Pre-tension the torsion spring with the draw tube provided
❒ Insert nut into relevant perforation as indicated in the table
❒ Insert stop screw from above and turn nut
❒ Slowly loosen tension of torsion spring as far as stop, remove draw tube and
tighten screw
4.3.10 Closing the wall penetration
❒ Pack the space in the wall penetration with a non-flammable insulating material
➥ The partition must be insulated to conform with ÖNORM B 3836 or DIN
4102-11!
❒ Close the wall penetration on the store side and the boiler room side with a non-
flammable covering
NOTICE
Do not connect the transfer channel / rotary agitator duct to the brickwork (with
concrete), as this will transfer sound through all the brickwork.
Installation
4
Installing the discharge system
Installation and Operating Instructions | M1730116_en