❒ Place intermediate plate (J) over mitre gear and fit to flange of rotary agitator duct
➥ Intermediate plate and top edge of trough of discharge screw should be on the
same level (3),
⇨ See "Information about setup" [page 18]
➥ Make sure the intermediate plate and rotary agitator duct are parallel!
➥ Tip: if necessary level out with spacer washers
❒ Attach cover for hole in wall (K) on boiler room side
➥ Pre-drill holes in wall
FBR 110-200
❒ Fit spring piles (L) with clamping plates (M) to ring of rotary agitator plate (N)
➥ The bend in the clamping plates must face away from the rotary agitator plate!
❒ Tighten the left and right screw connections alternately by 2 - 3 turns each, until
the spring pile is right next to the ring of the rotary agitator plate
❒ Fit cover plates (O) to rotary agitator plate