Assembly and installation
Operating instructions VISCOPOWER
95
E
N
G
L
IS
H
6.2 Assembly between progressive cavity pump and motor
Connecting the progressive cavity pump F 570 and motor
1. Place the motor at the centring at the gearbox.
2. Tighten the union nut.
The progressive cavity pump and the motor are now connected to each other.
Содержание F 570
Страница 133: ......
Страница 199: ...Anhang Appendix Annexe...
Страница 200: ......
Страница 201: ......
Страница 202: ......
Страница 203: ......
Страница 204: ......
Страница 205: ......
Страница 206: ......
Страница 207: ......
Страница 208: ......
Страница 209: ......
Страница 210: ......
Страница 211: ......
Страница 212: ...FB 10 58083001_02_1122 100 DEF...