2. Commissioning
2−29
Festo P.BE−CPX−FB23−EN en 0308NH
Setting the network parameters with GX Developer
(example)
1
2
3
4
5 6
7
1
Network parameters
2
CC−Link parameters
3
Set station data (see Fig.2/16)
4
Status if there is a CPU fault in the
main computer
5
Number of slaves to be connected
again during a scanning cycle
6
Configuration example (depending on
controller, see also Fig.2/17)
7
Number of connected slaves
Fig.2/15: GX Developer: Network parameters
Содержание CPX-FB23
Страница 2: ......
Страница 4: ...Contents and general instructions II Festo P BE CPX FB23 EN en 0308NH...
Страница 15: ...Installation 1 1 Festo P BE CPX FB23 EN en 0308NH Chapter 1...
Страница 45: ...Commissioning 2 1 Festo P BE CPX FB23 EN en 0308NH Chapter 2...
Страница 86: ...2 Commissioning 2 42 Festo P BE CPX FB23 EN en 0308NH...
Страница 87: ...Diagnosis and error treatment 3 1 Festo P BE CPX FB23 EN en 0308NH Chapter 3...
Страница 104: ...3 Diagnosis and error treatment 3 18 Festo P BE CPX FB23 EN en 0308NH...
Страница 105: ...Technical appendix A 1 Festo P BE CPX FB23 EN en 0308NH Appendix A...
Страница 117: ...Index B 1 Festo P BE CPX FB23 EN en 0308NH Appendix B...
Страница 118: ...B Index B 2 Festo P BE CPX FB23 EN en 0308NH Contents B Index B 1 B 1 Index B 3...