
1.
Turn
SMU
to
OFF
and
then
back
ON.
Record
the
software
version
as
it
flashes
on
the
screen
for
approximately
2
seconds.
2.
Record
the
number
of
CYCLES
from
the
“STATUS”
screen.
3.
Ensure
power
to
unit
is
OFF
and
the
incoming
power
is
disconnected.
4.
Remove
the
right
‐
side
panel
for
access
to
the
electrical
box.
5.
Gently
remove
the
MJ2
connector
(RJ45
connector
near
side).
6.
Gently
remove
the
orange
J1
connector
(near
side)
and
the
black
J2
connector
(far
side).
7.
Gently
remove
the
incoming
power
connector
(bottom
side).
8.
While
holding
the
PLC
from
the
front
of
the
sterilizer
to
keep
it
from
falling
out,
remove
the
4
gold
‐
colored
mounting
clips
from
the
slots
in
the
PLC
case.
9.
Pull
the
PLC
out
through
the
front
of
the
sterilizer.
10.
Document
the
serial
numbers
of
the
old
and
the
new
PLCs
in
the
maintenance
log.
11.
Make
sure
the
gasket
is
installed
on
the
PLC
and
is
free
from
dust
and
debris.
Check
that
the
corners
of
the
gasket
are
secure.
12.
Insert
the
new
PLC
into
the
panel.
13.
Insert
the
4
mounting
clips
into
the
slots
in
the
PLC
case.
One
clip
should
be
installed
on
each
corner.
14.
Lightly
tighten
each
screw
so
the
clip
is
held
in
place.
15.
Tighten
the
screws
on
the
clips
such
that
the
gasket
is
compressed
against
the
panel.
16.
Reinstall
the
incoming
power
connector
(bottom
side).
17.
Reinstall
the
black
J2
connector
(far
side)
and
the
orange
J1
connector
(near
side).
18.
Reinstall
the
MJ2
connector
(RJ45
connector
near
side).
19.
Connect
the
incoming
power
to
the
sterilizer.
20.
Turn
the
sterilizer
ON.
21.
As
the
PLC
boots
up,
take
note
of
the
software
version
as
it
flashes
on
the
screen
for
approximately
2
seconds.
If
the
software
version
in
the
newly
installed
PLC
is
older
than
what
was
noted
in
Step
1,
the
software
should
be
updated.
Contact
FDI
for
update
information
and
procedures.
22.
Reset
settings
using
the
“CONFIRM
SETUP”
screen,
including
resetting
the
barometric
pressure.
23.
Update
the
number
of
CYCLES
from
the
“STATUS”
screen
by
pressing
on
the
number
itself
and
entering
the
correct
number
of
cycles
from
the
previous
PLC.
This
will
maintain
the
running
history
of
the
number
of
cycles
performed
by
this
sterilizer.
24.
Perform
biological
and
performance
testing
per
AAMI
ST79
on
the
sterilizer
to
qualify
the
efficacy
and
performance.
91
Содержание P2131
Страница 121: ... THIS PAGE INTENTIONALLY LEFT BLANK 115 ...
Страница 130: ...SECTION A APPENDIX 124 ...
Страница 131: ...A 1 Swagelok Fitting Installation Instructions 125 ...
Страница 135: ...A 2 PLC Data Sheet 129 ...
Страница 141: ...A 3 VERIFY Product Information 135 ...
Страница 147: ...A 4 WRS Pump Information 141 ...
Страница 158: ...A 5 Vacuum Leak Test Troubleshooting Guide 152 ...