
30.
Using
the
shims
provided
in
the
side
zipper
section
of
the
SAB,
elevate
the
rear
of
the
SMU
to
ensure
there
is
a
slight
decline
from
the
back
of
the
unit
toward
the
front
to
allow
the
condensate
in
the
chamber
to
drain
properly.
From
a
level
starting
point,
this
will
be
approximately
4
shims
or
1”
under
the
rear
endcap.
The
target
angle
is
1.5°.
31.
To
test
for
proper
angle,
pour
a
cup
of
water
in
the
back
of
the
chamber,
and
ensure
that
it
flows
to
the
chamber
drain.
32.
Clean
the
chamber,
and
then
install
the
trays
found
in
the
SAB.
CAUTION
:
Do
not
allow
sand,
chemicals,
or
other
debris
to
flow
down
the
chamber
drain
into
the
WRS.
This
could
contaminate
the
water
or
damage
components
in
the
WRS.
33.
Ensure
that
the
power
switches
for
the
SMU
and
WRS
are
in
the
OFF
position.
22
Содержание P2131
Страница 121: ... THIS PAGE INTENTIONALLY LEFT BLANK 115 ...
Страница 130: ...SECTION A APPENDIX 124 ...
Страница 131: ...A 1 Swagelok Fitting Installation Instructions 125 ...
Страница 135: ...A 2 PLC Data Sheet 129 ...
Страница 141: ...A 3 VERIFY Product Information 135 ...
Страница 147: ...A 4 WRS Pump Information 141 ...
Страница 158: ...A 5 Vacuum Leak Test Troubleshooting Guide 152 ...