105
Revision date: 12.02.16
1. With all blackout system components fully installed, it will be imperitive to test the operation to verify funcionality.
If not already done so,
CONTACT A LICENSED ELECTRICIAN FOR ALL MOTOR WIRING DETAILS.
If electrical
wiring is not completed, motor can be manually operated with a drill and a 6mm Allen key adaptor inserted in the center of the
motor fan, though this will make operational test very slow-going.
2. O
perate the motor to open and close the leading edges one or two times to test the operation. If all leading
edges are not tightly sealed against the header in the "closed" position after opening and closing, return to all
attachments and adjust and test again as needed before continuing.
IMPORTANT:
Panels will not FULLY open. Due to the bunching properties of the blackout material, leading edges
will need to stop between 4" and 8" away from the rafter header profile.
3. When satisfied with position of leading edges after opening and closing, set the limits of the motor. Consult the
paperwork included with the motor for limit-setting procedures.
Verify that limits are set so that the rubber gasket of ALL leading edges is sealed tightly against the rafter headers
uniformly across the entire header profile when in the "CLOSED" position. Also verify that the leading edges are
limited to stop between 4" and 8" away from the rafter headers when in the "OPEN" position.
1. After all operation details have been tested, verify all areas are sealed tight and that light does not leak into
system. The following components have been added that may remedy trouble areas like corners, and along
sealing edges:
-115298, black-out tape
-111983, expandable weather stripping
-DE4007, polycarbonate sealing caulk
ATTENTION:
Many minor details and touch-ups are taken care of at the customer's discretion. A great deal of
carefulness, craftsmanship, and throroughness is required, and proper installation will eliminate potential issues.
2. With the "shower curtain" design of the blackout system, a major wear-point of the blackout fabric is where the
fabric drapes over the corner cables and rides along as the system opens and closes. For fabric longevity, the
areas on the underside of the fabric that directly contact the corner cable can be reinforced with a continuous
run of 115298 black-out tape, though this will significantly add to the bunching properties when opening up. If
implementing, verify that this is considered when setting the motor limits.
Black-out System Installation
OPERATION TESTING
LIGHT DEPRIVATION
115198
Black-Out Tape
111983
Foam Tape
Содержание Growers Supply GrowSpan 500 Series
Страница 22: ...22 Revision date 12 02 16 Frame Assembly 5 0 66 0 FRQWLQXHG Customer supplied rafter spacing jig ...
Страница 65: ...65 Revision date 12 02 16 Roll Up Side Panel Installation ...
Страница 111: ...111 Revision date 12 02 16 Additional Notes Space below is reserved for customer notes ...