88
Revision date: 12.02.16
Black-out System Installation
+25,=217$//($',1*('*(6FRQWLQXHG
Measure this distance. Cut to fit
sections of 113318 leading edge
and splice together.
Dashed line indicates
horizontal leading edge
location at each bay.
See splice diagram below.
LEADING
EDGE SPLICE
Temporarily secure in
place against the header
with 115199 tape.
113318 (full)
113318 (cut to fit)
107777
splice reinforcement
plate
Slide continuous length
of 115226 rubber gasket
through the assembled
leading edge.
ATTENTION:
Leave approximately 9' of
115226 rubber gasket loosely dangling
from either end of the horizontal leading
edge sections. These will be inserted
into the vertical leading edge sections,
after installed.
113311 splice
See "ATTENTION"
note below.
(bottom view)
*some framing
removed for clarity
Содержание Growers Supply GrowSpan 500 Series
Страница 22: ...22 Revision date 12 02 16 Frame Assembly 5 0 66 0 FRQWLQXHG Customer supplied rafter spacing jig ...
Страница 65: ...65 Revision date 12 02 16 Roll Up Side Panel Installation ...
Страница 111: ...111 Revision date 12 02 16 Additional Notes Space below is reserved for customer notes ...