49
Revision date: 12.02.16
End Panel Installation
,167$//+25,=217$/+&+$11(/63/,&,1*9(57,&$/:($7+(5675,33,1* 7(50,1$7,2178%,1*
Consult the technical documents at the back of these instructions for further detail. Repeat steps for both end walls.
1. Using #14x1-1/2" Tek screws (FA4484B) & neo-bonded washers (102981B), attach sections of 113236Z127
H-channel to the outside face of the 2"x2" end wall header, rafter-to-rafter, as shown below. Cut to fit as needed.
IMPORTANT:
Verify that H-Channel is positioned so that the center channel is facing the attachment surface.
2. Using 1/4"x3-1/4" tapcon screws (FA7165) , attach sections of 1"x1-1/2" tubing (113301) directly to the ground
along the base of the 30' opening, as shown below. Run a bead of 112263 construction sealant between the
ground and the 113301 tubing. Cut to fit as needed.
IMPORTANT:
Verify that the outside facing plane of the 113301 tubing is FLUSH with the outside facing plane of
the endwall columns and base plates. See below.
3. Line the outside faces of the 2"x2" vertical header with 111983 expanding weather foam tape. Extend out to the
rafter leg to the ground, as shown below. Polycarbonate panels will "sandwich" the 111983 weather tape as it
expands creating a light deprivation seal along the header profile.
111983 Weather
Stripping
View as seen from
the outside looking in.
NOTE:
Some framing
has been removed
for clarity.
column
113236Z127
H-channel
(cut to fit)
Rafter
2"x2"
Header
FA4484B
Tek screws
column
column
column
DETAIL
A
DETAIL
B
DETAIL
A
DETAIL
B
[113301]
Содержание Growers Supply GrowSpan 500 Series
Страница 22: ...22 Revision date 12 02 16 Frame Assembly 5 0 66 0 FRQWLQXHG Customer supplied rafter spacing jig ...
Страница 65: ...65 Revision date 12 02 16 Roll Up Side Panel Installation ...
Страница 111: ...111 Revision date 12 02 16 Additional Notes Space below is reserved for customer notes ...