42
Revision date: 12.02.16
INSTALL FRONT END WALL DOOR OPENINGS
Consult the end frame diagrams near the back of these instructions. Verify the drawing is for the FRONT end wall, or
the wall with the door. Cross reference with the instructions provided for the door. Verify proper dimensions and frame
for doors accordingly.
End Frame Assembly
All dimensions shown
are inside-to-inside.
1. Based on the instructions provided with separately purchased door kit, install door framing (2"x2" tubing provided,
but optional, depending on customer-provided door). Dashed lines in below diagram show recommended location
of a door. If installing in an end wall with ground post mounting, dig an 8"-10" diameter hole at door column
locations at a depth that is
below geographic frost line
. (Minimum depth: 24".)
IMPORTANT:
Consider the door position
when open
WRSUHYHQWFRQÀLFWVZKHQLQVWDOOLQJDFFHVVRULHV
2. Consult door opening locations and dimensions. Cut 1.5"x1.5" cross beams accordingly, and frame around door
opening accordingly using QH1330 brackets, and Tek screws. See diagram below.
3. After door opening framing has been installed, continue by installing the BACK end wall frame.
Cut and remove
cross beam sections
as needed.
Provided Door Framing
(S20P120, cut-to-fit)
Tek screws
QH1330
Содержание Growers Supply GrowSpan 500 Series
Страница 22: ...22 Revision date 12 02 16 Frame Assembly 5 0 66 0 FRQWLQXHG Customer supplied rafter spacing jig ...
Страница 65: ...65 Revision date 12 02 16 Roll Up Side Panel Installation ...
Страница 111: ...111 Revision date 12 02 16 Additional Notes Space below is reserved for customer notes ...