83
Revision date: 12.02.16
1. Once an entire run of keder channel has been installed on a rafter, slide a
continuous length of 115018Z046 keder sealing strip into the 111984 keder
channel along the entire contour of the profile. Cut to fit, if necessary.
HELPFUL HINT:
For ease of installtion, slide the sealing strip through the
horizontal section of the keder channel first, leaving approximately 8' of sealing
strip dangling on either side. Then slide those dangling sections into the vertical
sections of keder channel from the top.
2. Once installed, use provided 115198 blackout-out tape, sealing caulk, etc. to
seal these locations for light leakage prevention. See below.
Black-out System Installation
,16(57.('(56($/,1*675,3
115018Z046
Keder Sealing Strip
115198
Black-Out Tape
Содержание Growers Supply GrowSpan 500 Series
Страница 22: ...22 Revision date 12 02 16 Frame Assembly 5 0 66 0 FRQWLQXHG Customer supplied rafter spacing jig ...
Страница 65: ...65 Revision date 12 02 16 Roll Up Side Panel Installation ...
Страница 111: ...111 Revision date 12 02 16 Additional Notes Space below is reserved for customer notes ...