STC Easy2Build Easy-Grow Скачать руководство пользователя страница 1

Easy2Build

TM

Smart Tech solutions

7

Str

ucture

10

8’ x 8’ Easy-Grow Greenhouse

 Assembly Instructions

Systems Trading Corporation

450 7th Avenue   Suite 2809,  New York,  NY   10123

Customer Service: (877) 407-9100 ext 1    Email: [email protected] 

P

C S

HE

L

L

Содержание Easy2Build Easy-Grow

Страница 1: ...utions 7 S tr ucture 10 8 x 8 Easy Grow Greenhouse Assembly Instructions Systems Trading Corporation 450 7th Avenue Suite 2809 New York NY 10123 Customer Service 877 407 9100 ext 1 Email customerservi...

Страница 2: ......

Страница 3: ...t to ensure proper ventilation We have also included an automatic vent opener to help you maintain optimal temperature effortlessly When properly assembled and maintained this greenhouse will provide...

Страница 4: ...11 14 15 16 17 10 6 7 Safety Advice The greenhouse must be positioned and fixed on a flat level surface Dispose of all plastic bags safely Keep them out of the reach of small children Keep children an...

Страница 5: ...L04G 2 2 2 2 Step 17 L04F 2 Step 1 Step 3 L04B 2 Step 4 Step 4 Step 4 L03N L030 L03P L03Q Step 3 Step 3 L01I L01J L01K L01L Profile QTY L13B 2 1 1 1 1 1 1 Step 2 Step 2 Step 2 Step 2 Step 2 Step 2 Ste...

Страница 6: ...tep 4 S39 1 Step 8 S21 1 10 Steps 2 3 Step 3 1 Step 1 S28 S18 S12 Panel QTY 2 Step 1 2 Step 1 Y1 2 Step 3 Y19 2 Step 2 Y25 2 Step 2 Y26 Y16 2 Step 1 Y17 1 Step 3 Y5 1 Step 3 Y6 1 Step 3 Y20 2 Step 1 Y...

Страница 7: ...4 Step 4 S22 S20 6 6 S34 S35 Step 16 Step 16 Anchor Clip and Peg QTY 5 of 55 www stcny com circular vent vent frame plastic nut 4 1 Step 11 1 Step 11 Step 11 Circular Vent QTY 20 J05 Step 17 Shelf Tr...

Страница 8: ...with hole in each profile 28 711 mm L03C L03D S01 S02 S02 Place all the parts for the back face on a level surface Make sure the pieces are in the correct positions before assembling Carefully follow...

Страница 9: ...and L03C to profile L04F by sliding the long sides of connector S01 into channels lining up last hole in S01 with holes in profile L04F Attach profiles L03D and L02A to profile L04F by sliding the lo...

Страница 10: ...rs S08 into channels of profiles L03C L03D and L03K 1 4A 1 5A Secure with four S02 screws 1 4B Secure each connector with two S02 screws 1 5B QTY 6 3 S02 S08 Connector L03L L16 S08 S02 NOTE ALL VIEWS...

Страница 11: ...here is only one way to properly fasten connectors into profiles Line up parts first to ensure correct placement Slide connectors until they CLICK securely into profile Use WD40 or liquid soap if piec...

Страница 12: ...channels of profiles L05A and L05H as shown Screw hex nut S14 onto bolt Do not completely tighten 1 7B 1 8B QTY QTY 2 2 L05A L05H Profile Nut Bolt 6 6 S13 S14 L05A L05A L05H S13 S14 10 of 55 www stcn...

Страница 13: ...and Y18 into V channels on profiles L02A L02B L03C L03D and L03L Fit inside channels on profiles L05A and L05H 11 of 55 www stcny com Remove protective plastic from EACH side of poly carbonate panels...

Страница 14: ...nectors into profiles Line up parts first to ensure correct placement Slide connectors until they CLICK securely into profile Use WD40 or liquid soap if pieces do not easily slide together Wear gloves...

Страница 15: ...nsure correct placement Slide connectors until they CLICK securely into profile Use WD40 or liquid soap if pieces do not easily slide together Wear gloves NOTE ALL VIEWS ARE FROM INSIDE Slide connecto...

Страница 16: ...ght Use hex key to securely tighten and hold in place Repeat step 1 13 inserting cable connectors S06 into profiles L02A and L01J Cable rests next to panel Y1 under profile L04F Slide connector until...

Страница 17: ...m both sides of panels Y25 Place side to face toward the sun facing down Fit panels into channels of profile L05I L05I 15 of 55 www stcny com Remove protective plastic from EACH side of poly carbonate...

Страница 18: ...brace L15B onto door lining up the holes on each end with the holes in profiles L13E and L13B Slide hex bolt so it fits through hole in brace Secure brace with two S02 screws and S14 hex nut NOTE The...

Страница 19: ...L13C L13C S33 17 of 55 www stcny com 2 7A 2 8A Slide two hex bolts S13 into channel of profile L05F Screw two S14 hex nuts onto bolt on each end Do not completely tighten 2 7B L05F S13 S14 L05F Remove...

Страница 20: ...screws Place S40 locks on profiles L13D and L13G as shown Center the levers so the screw holes are visible L13H L13F L13G L13D S40 L13G S40 L13D 2 9B Move lever to the right side to place lock in the...

Страница 21: ...e face to the ground ALL VIEWS ARE SHOWN FROM INSIDE Place all the parts for the front face on a level surface Make sure the pieces are in the correct positions before assembling Carefully follow the...

Страница 22: ...ides of connectors S01 into channels of profile L04A lining up last hole in S01 with holes in profile L04A Attach profiles L06A and L02A to profile L04A Slides long side of connectors S01 into channel...

Страница 23: ...Connectors S09 S10 and S18 CLICK into place There is only one way to properly fasten connectors into profiles Line up parts first to ensure correct placement Slide connectors until they CLICK securely...

Страница 24: ...ether making sure panel Y20 fits into V channels of profiles L02L and L02K Connectors S17L and S17R rest in channels of L02L and L02K Connectors S09 and S10 click securely into profiles S10 L02A S09 L...

Страница 25: ...L02B L06A and L06B Fit inside channels on L05C profiles Remove protective plastic from EACH side of poly carbonate panels before installing Dispose of plastic properly Install with side labeled Face t...

Страница 26: ...shown Line up outside holes on connector L16 with holes on profiles L01L and L01K Secure with four S02 screws Secure with two S02 screws 3 7D Secure with two S02 screws 3 7B 3 7C 3 8B NOTE ALL VIEWS A...

Страница 27: ...into V channels Snap connectors S04 and S05 securely into profiles QTY 2 S02 Screw There is only one way to properly fasten connectors into profiles Line up parts first to ensure correct placement Sl...

Страница 28: ...tight Use hex key to securely tighten and hold in place Repeat step 3 10 inserting cable connectors S06 into profiles L02A and L01L Cable rests next to panel Y5 under profile L04A Slide connector unt...

Страница 29: ...1C L01C L03B L03B QTY 8 4 S02 S08 Connector QTY 4 4 S02 S20 QTY 4 L03B Profile Connector S20 S08 L03B L03B You are assembling both sides in the following steps Both sides are identical until step 6 1...

Страница 30: ...S02 screws Repeat to make two sets 4 3B 4 4B Slide another connector S01 so it lines up with the middle hole on profile L03A 4 4C Secure all pieces with S02 screws Repeat to make two sets L07B L01C L...

Страница 31: ...ofiles Secure with two S02 screws Repeat to make two sets S03 L04B 4 7B L03A L04C IMPORTANT Connector S03 rests on top of connector S01 S02 screw secures S03 to profile L04B QTY QTY 2 L04C Profile Scr...

Страница 32: ...o sets S03 S19 QTY 2 S03 QTY 2 S19 Connector Connector 4 8A 4 9 30 of 55 www stcny com Connectors S03 and S19 CLICK into place Connectors S39 CLICKS into place There is only one way to properly fasten...

Страница 33: ...07B S03 L01C L01C 31 of 55 www stcny com NOTE ALL VIEWS ARE FROM INSIDE Connectors S03 and S19 CLICK into place There is only one way to properly fasten connectors into profiles Line up parts first to...

Страница 34: ...nnector QTY Profile 2 2 2 2 QTY Profile 5 1A 5 1B Place all the parts for the shelves on a level surface Make sure the pieces are in the correct positions before assembling Carefully follow the order...

Страница 35: ...ainst the wall Stand each side up and place next to the back Both sides are identical until the shelf profiles are connected Make certain that positions of profiles L07A and L07B match the diagrams be...

Страница 36: ...l connectors click into place L14C L14A L07A S03 S39 Secure connectors S37 to profile L04F with S02 screws L04F 6 2A 6 2B S10 L07A S05 L01C L04F S37 S37 34 of 55 www stcny com Connector S10 CLICKS int...

Страница 37: ...til you finish this step This will make it easier to keep the angles square 7 1 35 of 55 www stcny com Connectors S03 CLICK into place Connectors S03 CLICK into place There is only one way to properly...

Страница 38: ...e L04A Push front into sides until connectors click into place L07B S09 L04A S37 L01C S04 36 of 55 www stcny com Connectors S09 and S10 CLICK into place Connectors S04 and S05 CLICK into place There i...

Страница 39: ...of profile L04A Secure S37 connectors to L04A profiles with four S02 screws 7 3B QTY 4 S02 Screw L04A L14A L14C L14B L04A L14D S39 L14C S39 L14D 37 of 55 www stcny com Connector S39 CLICKS into place...

Страница 40: ...until it clicks securely into place L03O L03P S22 S02 S23 L03Q L03N 1 S23 QTY Brace 2 S02 1 L03N L03Q QTY QTY 1 1 S21 Connector Screw QTY Profile IMPORTANT U shaped cutout is not at midpoint of profil...

Страница 41: ...els of profiles L03M L03O and L03P 8 4 L03Q L03P NOTE U shaped cutouts on profiles L03O and L03P face the front NOTE U shaped cutouts on profiles L03N and L03Q face the back S20 L03O S20 L03P 39 of 55...

Страница 42: ...in correct positions before installing Arrange profile L02G so rectangular holes in channels face the LEFT when looking at the front of the greenhouse from the outside IMPORTANT Arrange profile L02G s...

Страница 43: ...rews Line up bracing bar S23 withholes in profiles L03A and L03Q Secure one S02 screw partially into each end Tighten both screws S22 L02G S02 8 7A 8 8A S20 S02 L03O S20 S02 L03P QTY 10 S02 Screw 8 7B...

Страница 44: ...he pieces are in the correct positions before assembling Please carefully follow the order of assembly to ensure an easy installation Wear proper safety gear including shoes gloves and goggles Attach...

Страница 45: ...9 3 inserting cable connectors S06 into profile L07A with hook facing the front and into profile L01C with hook facing the back Cable rests behind profile L14A Slide connector until profile corners a...

Страница 46: ...0 The auto vent opener is packed separately Remove protective plastic from both sides of panels Y24 Place side to face toward the sun facing down Fit panels into channels of profiles L10A and L11A L11...

Страница 47: ...ent Opener Screw assembly knob partially into threaded end of cylinder Do NOT tighten Screw two S14 hex nuts onto bolts on ends of each profile Do not completely tighten S13 S14 L05G L05D L05G L05D L0...

Страница 48: ...other end is visible Screw S24A into hole in L08A and slide vent back until it rests next to the screw IMPORTANT The handle of roof vent is on the inside of the greenhouse Y24 L11A L08A L05D L11A L08A...

Страница 49: ...ep ladder inside the greenhouse Install second roof vent to the left side of the greenhouse Slide profile L11A into profile L08B from the back of the greenhouse towards the front Continue to slide ven...

Страница 50: ...l Y6 and slide into place From the inside of the greenhouse slide circular vent under the cable Line up pins in vent frame with holes in circular vent and slide into place 11 1B From the inside secure...

Страница 51: ...s of panels Y21 Y22 and Y23 Place side to face toward the sun facing out when installing Slide panels carefully into V channels in gable profiles L03M L03N L03O L03P and L03Q and into V channels of fr...

Страница 52: ...gth with scissors Make sure to insert stripping as shown securely into the V channels of all the profiles cutting each piece to the proper length This will help protect the inside of your greenhouse f...

Страница 53: ...plate L09B to profile L07B in the back 14 2A 14 2B Place trim plates L09A and L09B onto profiles L07A and L07B on outside of greenhouse Trim plates fit over edges of side and roof panels and bolts ar...

Страница 54: ...of the greenhouse slide plastic trim plates J02L J02R and J03 into connectors S09 S10 and S12 until they snap into place IMPORTANT The plastic trim plates J02L J02R J03 and J06 fit into connectors on...

Страница 55: ...it IMPORTANT The rubber stripping J01A is cut to length with scissors Make sure to insert stripping as shown securely into the V channels of all the profiles cutting each piece to the proper length T...

Страница 56: ...a hammer to drive the pegs all the way into the concrete and let dry completely for twenty four hours QTY S35 Anchor Peg QTY S34 6 6 Anchor Clip IMPORTANT The greenhouse must be firmly secured to the...

Страница 57: ...all the parts for the trays and bin holder on a level surface Make sure the pieces are in the correct positions before assembling Carefully follow the order of assembly to ensure an easy installation...

Страница 58: ...Notes...

Страница 59: ...Notes...

Страница 60: ...ion Systems Trading Corporation If you need any help or have missing or damaged parts please contact us Please keep this manual in a safe place for reference 450 7th Avenue Suite 2809 New York NY 1012...

Отзывы: